| Status | Project Number | Project Name | Project Manager | Project Location | Client | Sector | Service | Description | Project Image |
|---|---|---|---|---|---|---|---|---|---|
|
On Progres
Dec 2009 - Dec 2010 |
3027 | Teluk Dalam Nickel Ore Development - FEED | - | Sulawesi, Indonesia | Bumi Modern (Fuji Group - (Japan) |
|
|
Consultancy advice to support the development of Direct Ore Shipment infrastructure. |
No Image |
|
On Progres
Jun 2024 - Aug 2026 |
3215 | On-Call Engineering Services - Vale JV Nickel Process Plant Projects under Construction Duration: - Sep 2023 to Aug 2026 | - | Sambalagi, Central Sulawesi Pomalaa, South East Sulawesi Malili, South Sulawesi Indonesia | PT Vale Indonesia |
|
|
Vale Indonesia with their joint venture partners over the next 3 to 5 years are developing a number of Growth Projects to produce nickel including a Rotary Kiln Electric Furnace (RKEF) Plant in Sambalagi, Central Sulawesi, a High-Pressure Acid Leach (HPAL) Plant in Pomalaa, Southeast Sulawesi and another in Malili, South Sulawesi. Project includes several LNG Power Plants, LNG Jetty & LNG Bulk Storage Facilities. Resindo Scope of Services is to provide multi-disciplinary Engineering support for evaluations of: § Sambalagi RKEF Project JV Partner designs; § Pomalaa HPAL Project JV Partner designs; § Sorowako HPAL Project JV Partner designs, and; Project Engineering support for evaluations to any other JV Growth Projects. |
|
|
On Progres
Nov 2024 - Jan 2025 |
3215_7 | Bahodopi Port Expansion Basic Eng Design & IMB Bahodopi FEL3 Design Review (Vale On-Call Engineering Support Services) | Yanuar Akhadi | Bahodopi, Central Sulawesi | PT. Vale Indonesia (PTVI) |
|
|
Resindo is engaged to provide Design Review of the PTVI Bahodopi Coastal Barge Port study, then Resindo will undertake the Engineering Design including; calculations, drawings & details for all aspects of the Coastal Barge Port and it’s Haul Truck shore Jetty access. |
|
|
On Progres
Dec 2024 - Feb 2025 |
3215_8 | Hydrology & Geotechnical Engineer Site Investigation (Vale On-Call Engineering Support Services) | Yanuar Akhadi | Pomalaa, Southeast Sulawesi | PT. Vale Indonesia (PTVI) |
|
|
Resindo is engaged to provide engineering support for evaluation of JV partner design and to carry out the following assessment, evaluation and recommendation as below, but not limited to: 1. Hydrology Engineering
2. Geotechnical Engineering
Geotechnical Surveys to assess subsurface conditions |
|
|
On Progres
Nov 2024 - Nov 2025 |
3224 | Gold Plant Construction Management Support | Yanuar Akhadi | Banjarbaru, South Kalimantan | PT. Pelsart Tambang Kencana |
|
|
Resindo are providing personnel to form part of an integrated Client Project Management Team (PMT) at Site including;
The responsibility is ensuring that the products or services in Project meet established quality standards and specification with detail as follows:
|
|
|
On Progres
Dec 2024 - Feb 2025 |
3226 | Transfer Point to FPP Stockpile Conveyor | Yanuar Akhadi | Pomalaa, Southeast Sulawesi | PT Vale Indonesia |
|
|
Conceptual Study for the replacement of trucking from Ni ore stockpile to Process Plant feed stockpile.
|
|
|
On Progres
- - - |
3226 | Transfer Point to FPP Stockpile Conveyor | coba | coba Southeast Sulawesi | PT Vale Indonesia |
|
|
A Conceptual study to enable the relative economics of conveying ore from the transfer point preparation plant stockpiles against using 50 Ton Truck and Excavator. Deliverable: Desktop Assessment, Concept Design and Cost Estimation
Report summarizing findings and recommendation |
|
|
On Progres
Dec 2024 - Jun 2025 |
1125 | Sekampar Port Phase 2 Coal DFS | Yanuar Akhadi | Kutai Kertanegara, East Kalimantan | PT Rencana Mulia Baratama |
|
|
The Scope of Work includes;
|
|
|
On Progres
Jan 2025 - Feb 2025 |
1126 | CBU Assessment CIP Port Stock Yard | Yanuar Akhadi | Bontang, East Kalimantan | PT Indominco Mandiri |
|
|
Resindo is also now undertaking the detailed design review and assessment for the fifteen (15) year old 4100 tph Coal Continuous Barge Unloader (CBU) at IMM Bontang Coal Port. This work specifically includes;
|
|
|
On Progres
Nov 2024 - Jan 2025 |
1123 | BP Intermediate Stockpile (ISP) Capacity Layout Design, Geotechnical & Hydrology Physical Investigation & Analysis. | Maman Faturochman | Central Kalimantan | PT. Borneo Prima (IMR Group) | The Scope of Work is to determine an optimum Materials Handling system Layout for planned & Future Expansion for 4.5 mtpa with multiple Coal Barge Unloaders, Bargeloaders & Products. Due to remote nature, facility will have a small Operations Camp, Fuel Facilities, Diesel Genset Power, Personnel Jetty, etc. Work includes Capacity Design / Layout, Geotechnical Drilling, Laboratory Tests, Geotech Analysis / Report, Hydrology to determine Pad / Flood levels, etc. |
|
||
|
On Progres
Jan 2025 - Jan 2025 |
3215_10 | Revision of IFC Stockpile Delaney 1 | Yanuar Akhadi | Sorowako, Central Sulawesi Indonesia | PT Vale Indonesia | Resindo provide an update to the IFC documents to optimize total material balance of Stockpile Delaney 1, including cut, fill, pavement, stockpile and road |
|
||
|
On Progres
Apr 2025 - May 2025 |
3227 | Procurement Support Crushing Plant 200 Tph | Yanuar Akhadi | Sekotong, Lombok, West Nusa Tenggara | PT. Indotan Lombok Barat Bangkit | The main scope is to provide Document Review and Procurement Recommendation for 200 TPH Crushing Plant as follows: 1) Review quotation received from Supplier for processing plant equipment (Crushing Plant, Agglomeration Plant and ADR System). 2) Assessment and selection of Supplier and equipment. 3) Determine equipment sourcing strategy. 4) Recommendation Supplier and equipment to procure. 5) Review DED Factory Acceptance Test (FAT) |
|
||
|
Finish
Jan 2011 - Dec 2012 |
3066 | Nickel Plan Development | - | Southern Sulawesi | PT. Ceria Nugraha Indotama (CNI) (Indonesia) |
|
|
Development of Nickel plan with key technical aspects, Capex & Opex costs for Direct Ore shipment to simple process plant, followed by major process plant. Focus on technical requirements; coal fired power plant, mining infrastructure, port, coastal bulk fuel facilities, mine infrastructure, community and environmental aspects. Process inputs by Independent & Ausenco Consultants, resource model by CSA Global. |
|
|
Finish
Jan 2015 - Dec 2016 |
6035 | Ciawi-Cigombong/Lido Toll Road & Bridges Detailed Design – Work Pkges 2&3 | Maman Faturahman | Ciawi-Cigombong | POSCO E&C Indonesia (Korea) for Trans Jabar Tol |
|
|
Detail design for the new Toll Road with multiple bridges to fit the actual topography for construction |
|
|
Finish
Jan 2010 - Dec 2011 |
3026 | Falcondo Nickel Heap Leach Test Facility FEED | - | Dominican Republic | Xstrata (Canada), Ausenco Vector (Aus) |
|
|
Front End & detailed Engineering for Test facility using heap leach columns for Xstrata development project. Workscope includes, structure, columns, utilities, etc. All engineering is undertaken in Jakarta, all equipment, steel, electrical etc is to USA standards. Capex based on local costs for labour & materials. Process inputs & coord by Vector. System design is to Xstrata’s HSE stringent requirements including HAZOP workshops. |
|
|
Finish
Jan 2015 - Jan 2016 |
6049 | Road & Bridge Study | - | Myanmar | PUMA Energy (Myanmar) / SMEC)_ |
|
|
Working jointly together, SMEC-Resindo undertook the road & bridge options review, structural & civil analysis and preliminary design. Work also included Capex development. |
|
|
Finish
Jan 2010 - Dec 2011 |
3027 | Teluk Dalam Nickel Ore Development – FEED Technical Review/ support | - | Sulawesi, Indonesia | Bumi Modern (Fuji Group - Japan) |
|
|
Technical review of development plans including infrastructure, Bulk Materials Port, Capex and Opex for all operations including mining, stockpiling, haulage & port operations for Direct Ore Shipment infrastructure. Development of Tender documentation for Contractors, assist in review, implementation methodologies. |
|
|
Finish
Dec 2009 - Dec 2010 |
1003/1006 | Minerals Development Consultancy | - | Indonesia | DHV Indonesia |
|
|
Consultancy to support DHV in the development of capability in the minerals sector. DHV are a leading consultant in water & wastewater systems. |
|
|
Finish
Jan 2010 - Dec 2011 |
3032 | Agata Nickel Process Plant & Support Infrastructure (PFS) | - | Philippines | Mindoro Resources Ltd. (Philippines) Ausenco Minerals & Ausenco Vector (Aus) |
|
|
Pre-Feasibility Study for: Process Plant Infrastructure, Off site infrastructure including haul roads, Coastal Port infrastructure for major vessels; bulk carrier arrivals and discharge, container vessel loading and product export, camps, tank farm fuel facilities, etc. Study includes Capex and Opex development for all areas. All engineering is undertaken in Jakarta, all equipment; steel, electrical etc is to be sourced in Philippines, generally to ASTM (USA) & IEC standards. |
|
|
Finish
Dec 2023 - Dec 2024 |
5060 | Solar Array Power Plant Study | - | Central Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo was engaged to produce a DFS and directly the FEED development of a 2MWp Solar Power Farm to supply Offices, Workshops and other Process Plant supporting infrastructure. Works includes solar plant design, earthworks, drainage, substation, supporting facilities and Capex. The system will act as an alternative green supply for selected infrastructure with switchover to the Grid system for night periods. System will be designed to enable the addition of Battery connections in future. |
|
|
Finish
Jan 2010 - Dec 2011 |
3031 | Jogja Iron Sands Project: Mine Infrastructure, Transport & Power Options Study | - | Jogjakarta, Indonesia | PT. Jogja Magasa Iron -Indo Mines Limited (Aus) |
|
|
Study for two packages:
Work includes site investigation, prelim design, capital and operating cost estimates. |
|
|
Finish
Dec 2019 - Dec 2020 |
- | Aqua Culture Access Road & Jetty Development Study | - | Lake Toba North Sumatra Indonesia | PT. Regal Springs Indonesia |
|
|
Development and review of new road options to relocate the onshore operations and provide a new Jetty for current operations and future expansion. Work includes development options, routes and capital costs. |
|
|
Finish
Jan 2010 - Dec 2011 |
3045 | Morowali Nickel Heap Leach Process Plant & Support Infrastructure | - | Sulawesi, Indonesia | Bumanik (Indonesia) (PSAB : IDX) - Ausenco Vector (Aus) |
|
|
Scoping Study for: Process Plant Infrastructure, Off site infrastructure including haul roads, Port infrastructure, camps, bulk river port fuel facilities, etc. Study includes Capex and Opex development for all areas. |
|
|
Finish
Dec 2020 - Dec 2021 |
5059 | Nickel Process Plant 150 kV Substation, Design DFS. | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Supporting Client for PLN discussions for 150kV supply to Process Plant. Design of 150kV substation to receive the 150kV PLN supply and feed the RKEF Process Plant. Work includes design, Capex and section of DFS report. |
|
|
Finish
Jan 2010 - Dec 2011 |
3011 | Gag Island Nickel Process Plant & Supporting Infrastructure Study | - | Gag Island, Maluku, Indonesia | Antam (Indonesia) Ausenco Vector (Aus) |
|
|
Scoping level study for the development of a commercial nickel processing facility with supporting infrastructure at Gag Island. Infrastructure includes bulk coastal port for Panamax vessels, mining infrastructure, process plant infrastructure, coastal bulk fuel farm, major Operations camp; engineering and estimating. |
|
|
Finish
Jan 2023 - Jan 2024 |
3206 | Nickel Cobalt Process Plant EPCM | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo is undertaking the EPCM jointly with the client including bulk tankage, pumping and piping for diesel fuel and acid storage. |
|
|
Finish
Jan 2010 - Dec 2011 |
3046 | Jogja Iron Sands Project: Pilot Plant – Engineering / QA Review Fabrication & Construction | - | Jogjakarta, Indonesia | PT. Jogja Magasa Iron -Indo Mines Limited (Aus) |
|
|
Resindo was engaged to review the quality and progress of the fabrication and construction works for the pilot iron sands processing plant to produce concentrate. |
|
|
Finish
Jan 2020 - Dec 2021 |
- | Various | - | Various | Various |
|
|
Resindo undertakes road and bridge design and implementation coordination as an integral part of many of our projects in addition to stand alone road projects. Our experienced staff using modern software tools design fit for purpose Haul Roads, Toll Roads, Access Roads and bridges for all industry sectors. Details can be found throughout our reference projects listed. |
|
|
Finish
Jan 2010 - Dec 2011 |
3024 | Morowali Nickel – Direct Ore Shipment (DOS) Development Study | - | Sulawesi, Indonesia | Bumanik (Indonesia) (PSAB : IDX) |
|
|
Engineering and management of 3rd Parties for the development of Direct Ore Shipment prior to process plant. Work includes engineering for Mine site infrastructure, haul roads, Coastal port option for large container vessels, river port (option) and offshore trans-shipment, bulk fuel facilities (coastal & river options) managing specialist consultants for bathymetry & hydrology, geotechnical investigation. |
No Image |
|
Finish
Dec 2023 - Dec 2024 |
6071 | Diesel Fuel Palm Oil Mixing & Distribution Farm – Concept Study | - | Indonesia | PT. Cuprum Industries Indonesia |
|
|
Concept Study including Plant layouts, Process Flow Diagrams and Capital Cost. Work included diesel tanks, palm oil tanks and support systems, mixing process and tank, product storage tanks, piping and pumping with 20kV substation. |
|
|
Finish
Jan 2010 - Dec 2011 |
3025 | Dampala Nickel Plant; Process Plant & Supporting Infrastructure Study. CFPP Power Plant Study. Mining Equipment & Infrastructure Study | - | Sulawesi, Indonesia | TransAsia (Indonesia) – Ausenco Vector (Aus) |
|
|
Coastal Port Coal Fired Power Distribution Haul Road Mine Infra Nickel Plant Bulk Fuel Farm | Scoping level study for three works packages:
|
|
|
Finish
Dec 2020 - Dec 2021 |
5057 | Awak Mas Gold Project – State Grid Power / HV Study | - | South Sulawesi Indonesia | PT Masmindo Dwi Area – Nusantara Resources Ltd (Aus) (ASX) |
|
|
Resindo is engaged directly by the Client to undertake the detailed modelling and analysis of the proposed state grid supply to the gold project. Work includes modelling the network from the nearest State owned generators, via a new 150kV transmission line to a new 150kV substation then feeding the loads for the process plant & supporting infrastructure currently in FEED. |
|
|
Finish
Jan 2010 - Dec 2011 |
3017 | Aquila Nickel Mine to Process Plant Overland Conveyor Study. Haul Road Study. (PFS) | - | Sulawesi, Indonesia | Solway (Russia) - Ausenco Vector (Aus) |
|
|
PFS level Study for the design, Capex and Opex for a 20km dual direction Overland Conveyor (OLC) for ore & granulated slag return. Development of Haul road design including bridges, capital & operating cost estimate as alternative to OLC. Support in integration of all estimate areas from diverse groups into a single complete estimate. |
|
|
Finish
Jan 2023 - May 2024 |
3223 | Metso Ausmelt TSL Furnace Pilot Plant Study | - | Central Sulawesi, Indonesia | Metso Australia Pty Ltd (Aus) |
|
|
The Study Scope of Work is the high level design of the Ore & Reagents Materials Handling, Cooling Systems, Furnace Piping & Electrical Systems, Smelter Building & Platforms to develop initial MTO’s to arrive at a Capital Estimate (Capex) +/- 25%. Includes installation cost for the Metso TSL Furnace equipment, gas handling, etc. providing a full Pilot Plant Cost based on Indonesia, Execution Plan and Construction Schedule. Resindo will draw on our previous TSL BoP FEED Engineering for the major TIMAH smelter undertaken previously with Metso (Outotec). |
|
|
Finish
Jan 2011 - Dec 2012 |
6008 | Drafting Services: Ni Process | - | Outside Indonesia | Ausenco Vector (Aus) |
|
|
Process Drafting Services, engineering & design services for process area piping & equipment layouts, utilities, etc for Various Nickel heap leach- hydrometallurgical, HPAL & Pyrometallurgical process projects; BHPB, Xstrata, other. |
|
|
Finish
Dec 2020 - Dec 2021 |
5051 | Coal Fired Power Plant Combustion Tuning (Boiler Optimisation) & Training | - | Surabaya Region Indonesia | PT Pembangkitan Jawa-Bali |
|
|
Resindo is working jointly with HRL (Australian; Experts in coal fired power plant performance optimisation) for the PJB Paiton Power Plant near Surabaya, Java, Indonesia. Resindo’s role is to provide equipment and engineering services for the works jointly with HRL who are the technology experts & training lead. |
|
|
Finish
Dec 2019 - Dec 2020 |
5058 | Aurora Solar Energy Project / PV Array Basic Engineering | - | South Australia | Emanden Technical Solutions Pty. Ltd. (Australia) |
|
|
Resindo was engaged to undertake the Basic Engineering design for the Aurora Solar Farm development In Adelaide, south Australia that would form part of the grid supply. The system will provide grid power to the State’s network. Resindo undertook the electrical including substation design, earthworks and civil design for the site. Battery (BESS) Equipment FEED design was undertaken by Client Emanden with Resindo developing the drawings for the Project. |
|
|
Finish
Dec 2019 - Dec 2020 |
5035 | PLTG Gas Power Plant (Captive) | - | East Kalimantan Indonesia | Western IPP consortium. |
|
|
Captive 100MW Gas Power Plant development; Feasibility through to implementation jointly with international partner. Further details confidentia. |
|
|
Finish
Dec 2018 - Dec 2019 |
3174 | Batu Hijau’s Elang Area Infrastructure Definitive Feasibility Study (DFS) | - | Sumbawa Indonesia | Sumbawa Indonesia |
|
|
Resindo is undertaking the DFS for Elang infrastructure. New pit development for the Batu Hijau Process plant. Work includes basic engineering, Capex, Opex and all associated engineering / technical works for the; Bulk Fuel Storage & Dispensing including cross country pipeline and pumping. |
|
|
Finish
Jan 2020 - Dec 2021 |
3220 | MMP Smelter Plant Buildings Detail Design (IFC) | - | Balikpapan, East Kalimantan | China ENFI Engineering Corporation (China) |
|
|
The Scope of Work is Detailed Design for the five (5) Plant Buildings;
Resindo will develop Buildings using a 3D basis (Autodesk Revit) with the details extracted in ACAD 2D, Structural designs will be modelled in SAP2000. All drawings will be dual language (Chinese-English) in the National Chinese Drawing format as per ENFI China Standards and using Chinese steel sections. |
|
|
Finish
Dec 2019 - Dec 2020 |
5054 | Bolivar Gas Power Plant Basic Engineering | - | Adelaide South Australia | Emanden Pty Ltd (Aus) |
|
|
Basic Engineering (Aus Standards) for the relocation of 4 x TM2500 single cycle GE gas power plant units. Work includes layout development, civil design, mechanical and electrical design for existing and new equipment (fuel, water, demin, transformers, panels, etc.) including substation & grid connection to Australian Grid Power Company (66kV). |
|
|
Finish
Jan 2023 - Jan 2024 |
3216 | CNI Smelter Slag Pump Station, Water Supply & Drainage Detail Design (IFC) | - | East Kalimantan Indonesia | China ENFI Engineering Corporation (China) |
|
|
The scope of work was to carry out the Civil Structural Detailed Design for the Slag Pump Station including structures, crane The bilingual deliverables (English & Chinese) includes; 3D Engineering Model for integration into overall Process Plant / Smelter, interpretation of the Client Geotechnical Report for IFC design, Pump Station General Arrangements, Water / Storage Ponds / Basins (suction pond, slag water return pond structure), Calculations, Detail Drawings IFC & MTO’s. Project is fast track to support the Client’s overall project development schedule. |
|
|
Finish
Jan 2023 - Jun 2024 |
3222 | Batu Hijau Plant Expansion – Desalination Plant Utilities Detailed Design | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
The scope of Works is to undertake the Multidisciplinary DED for Desalination Plant Utilities which has water source in the main SWIS Basin and supplies the Desalination Plant, Brine to Sea Dispersal pipeline, Fresh Water to Plant locations; Mass Balance, PFD, P&ID, Calculations & Detail Design of Pumps, Piping system, Civil, and E&I Systems tied into the SWIS, Desalination & Process Plant Expansion. Works Includes Mechanical, Piping, Electrical & Instrumentation Engineering. Works will be undertaken as 3D Engineering Models. |
|
|
Finish
Dec 2015 - Dec 2016 |
6044 | O&G Vessel Port - Civil Structural Design Peer Review | - | Indonesia | PT Petrosea TBK |
|
|
Resindo is engaged to undertake a civil & structural design Peer Review for a new logistics supply base for the berthing of O&G ocean vessels. |
|
|
Finish
Jan 2023 - Jun 2024 |
3214 | MMP Smelter Seawater Intake (SWIS) Detail Design (IFC) | - | East Kalimantan Indonesia | China ENFI Engineering Corporation (China) |
|
|
| The scope of work is to carry out the Detailed Design for the Seawater Intake system feeding the Smelter, including the Jetty mounted Pump Platform, Piping to the Smelter boundary, Electrical, Instrumentation & Control systems for construction. The bilingual deliverables (English & Chinese) includes; General Arrangements, Specs, Data Sheets, PFD’s, P&ID’s, Process Functional Description, Calculations, MTO’s and As-Builts, etc. Project is fast track to support the end Client’s Jetty design & construction already underway. |
|
|
Finish
Dec 2015 - Dec 2016 |
5027 | CENPRI IPP 25MW MFO Power Plant Project – Fuel Farm | - | Philippines | Energreen Group (Philippines) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2023 - Jan 2024 |
3206 | Nickel RKEF Process Plant 150 kV Substation, FEED & Construction Mgt | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
| Supporting Client for PLN discussions for 150kV supply to Process Plant. Design of 150kV substation to receive the 150kV PLN supply and feed the RKEF Process Plant. Works also includes 20kV extension (9km) & 20kV substation Design and management at 4 locations. Work includes modelling the network connection and Process Plant affects for PLN supply. |
|
|
Finish
Dec 2018 - Dec 2019 |
5048 | Wind Farm – 10 Turbines FEED | - | Kupang Indonesia | APDP (Macquarie Bank – STEAG JV) International Bank & German Utility |
|
|
Work includes the FEED design for civil and E-BoP plant construction including Capex. Roadworks includes public and site roads including design adjustments to existing public roads to allow the Turbine Blade transport to reach site, new Port for unloading equipment, Site facilities; substation, transmission line and towers 33kv and 70kV, etc. to connect to the PLN substation. Work also included supporting the Client for PLN meetings and completing the technical submission documentation for PLN for the Project. |
|
|
Finish
Dec 2015 - Dec 2016 |
- | SAPT 20MW HSD Power Plant - Fuel Farm | - | Karachi, Pakistan | HPH, Hutchison Port Holdings (Hutchison Whampoa Group) (HK) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jun 2023 - Jun 2024 |
3219 | Batu Hijau Plant Expansion – Sea Water Intake System (SWIS) | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
Scope of Work is the Multi-Disciplinary Detailed Design for the Main Pumps, Pump Selection review, Piping & Supports, Screens, & Maintenance Crane. Works Includes Mechanical, Piping, Electrical & Instrumentation Engineering. Works will be undertaken as 3D Engineering Models, then extracted in 2D for Construction Contractors |
|
|
Finish
Mar 2015 - Mar 2016 |
3091 | Nickel Process Plant & Infrastructure DFS | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2018 - Dec 2019 |
5053 | Pelican (Snapper) Point Gas Power Plant Basic Engineering | - | Adelaide South Australia | Emanden Pty Ltd (Australia) |
|
|
Basic Engineering (Australian Standards) for the relocation of 5 x TM2500 single cycle GE gas power plant units. Work includes layout development, civil design, mechanical and electrical design for existing and new equipment (fuel, water, demin, transformers, panels, control room, workshop etc) including substation & grid connection to Australian Grid Power Company (275kV). |
|
|
Finish
Jan 2023 - Jun 2024 |
5065 | Batu Hijau Plant Expansion – Process Water Detailed Design (IFC) | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
The Scope of Work is to carry out the Multi-Disciplinary Detailed Design for; Pump Station Bulk Storage Tank, Pumps, Mechanical, Structural, Civil, Piping, Electrical & Instrumentation Engineering. Works will be undertaken in 3D Engineering Models, then extracted in 2D for Construction Contractors, Steel Model to the Fabricator. Resindo will also provide the HAZOP Facilitator and Workshop with this package |
|
|
Finish
Jan 2015 - Jan 2016 |
1071 | BP Coal Mine Development - Definitive Feasibility Study (DFS) Infrastructure; Mine & Port | - | Central Kalimantan Indonesia | PT Borneo Prima / IMR |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2023 - Jan 2024 |
3206 | Nickel Cobalt Process Plant EPCM | - | Central Sulawesi Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo working jointly with the Client is undertaking the process infrastructure and balance of plant design, procurement and Project-Construction Management for the smelter development. RKEF by Chinese EPC Contractor with plant Civil Works design by Resindo to incorporate high seismic zone design requirements. Balance of Resindo works includes Design, Procurement & Project-Construction Mgt; process plant civil, process infrastructure, crushing and materials handling systems, infrastructure; port, power including MV distribution & 150kV substation, interfaces with PLN, river water intake system, site prep, haul and access roads, quarry, camps, etc. Includes commercial & technical contract development for the RKEF and Balance of Plant Packages. |
|
|
Finish
May 2014 - May 2015 |
- | Pipeline Access Road FEL2 | - | Java, Indonesia | Conoco Philips (COPI) |
|
|
Resindo undertook the FEL2 study for the new access road which will form the pipeline corridor between the current development on-shore field and the existing compressor plant. Workscope included working with COPI team to optimise the route to ensure the pipeline gas flow performance characteristics would be met. |
|
|
Finish
Jan 2023 - Jun 2024 |
3217 | Batu Hijau Plant Expansion – Deaeration Valve Station Detailed Design (IFC) | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
The Scope of Work is to carry out the Multi-Disciplinary Detailed Design for the Process Water earthworks, roadworks, foundations for the 3rd Party Substation, Switchgear, Backup Gensets, filed pipe benches and roads including culverts and a bridge to various Process Plant location Tie in Points (TIP) with 3rd Party Infrastructure. Works Includes Civil & Earthworks Engineering. Works will be undertaken as 3D Engineering Models, then extracted in 2D for Construction Contractors. |
|
|
Finish
Dec 2018 - Dec 2019 |
3164 | Nickel Cobalt Project Captive Power Plant Development Study | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Development of captive power plant 10MW dual fuel to supply the planned Nickel Cobalt process plant at a remote site. Workscope includes design, construction management, capital & operating costs. With the rollout of the PLN grid network in early 2019 project converted to 20kV substation design to connect with new PLN line |
|
|
Finish
Jun 2022 - Jun 2023 |
3213 | Saprolite HPAL Neutralisation Scoping Study | - | Central Sulawesi Indonesia | PT. Merdeka Battery Materials Tbk. |
|
|
Study to determine the suitability of saprolite for use in neutralization in a HPAL plant treating high grade limonite ore |
|
|
Finish
Jan 2023 - May 2024 |
3217 | Batu Hijau Plant Expansion – Process Water Plant & Field Supply Routes; Earthworks, Roadworks, Pipe Benches, Crossings (Bridge & Culvert) Detailed Design (IFC) | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
The Scope of Work is to carry out the Multi-Disciplinary Detailed Design for the Process Water earthworks, roadworks, foundations for the 3rd Party Substation, Switchgear, Backup Gensets, filed pipe benches and roads including culverts and a bridge to various Process Plant location Tie in Points (TIP) with 3rd Party Infrastructure. Works Includes Civil & Earthworks Engineering. Works will be undertaken as 3D Engineering Models, then extracted in 2D for Construction Contractors. |
|
|
Finish
Jan 2014 - Jan 2015 |
3047 | Awak Mas 2.5 mtpa Gold Project Pre-Feasibility Study (PFS) Update – Fuel Farm | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – One Asia Resources (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2017 - Dec 2018 |
3161 | Copper Project Captive Power Plant Study DFS | - | Central Kalimantan | Asiamet / KSK |
|
|
Development of captive power plant to supply the planned copper process plant at a remote site. Workscope includes DFS design, capital & operating costs. |
|
|
Finish
Dec 2014 - Dec 2015 |
3056 | Wetar Copper Main Plant 25ktpa Implementation Phase EpCM | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Bulk Fuel storage formed part of overall scope. First of four Tanks – HSD & MFO. Refer complete project description |
|
|
Finish
Jan 2024 - May 2024 |
3218 | Hu’u Project Operation Centre (HPOC) Facilities - Detailed Design (IFC) | - | Hu’u – Dompu, West Nusa Tenggara, Indonesia | PT Sumbawa Timur Mining (STM) Vale Group |
|
|
The Scope of Work is to carry out Detail Engineering Design Architectural, Civil, Structural, Mechanical-Electrical-Plumbing (“MEP”), with BoQ’s, Market Pricing for Construction. Buildings & all services will be 3D Engineering Modelled, then 2D extracted & further detailed for IFC documents. |
|
|
Finish
Dec 2016 - Dec 2017 |
5047 | Copper Project Captive Power Plant Study PFS | - | Central Kalimantan | Asiamet / KSK |
|
|
Development of captive power plant options to supply the planned copper process plant at a remote site. Workscope includes technologies, feasibility, capital & operating cost & recommendations. Power plants based on HFO, LNG and Coal Fired technologies with some renewable options for partial supply with main systems. |
|
|
Finish
Jan 2022 - Dec 2023 |
3219 | Batu Hijau Plant Expansion – Sea Water Intake (SWIS) Pump Chamber CFD Modelling | - | Sumbawa - West Nusa Tenggara, Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
Scope of Work is the Pump Station Suction Intake Computational Fluid Dynamics (CFD) Vortex Analysis. Develop the CFD model in specialist software with supporting 3D and 2D and/or suitable engineering level animations for the Pump Station vortex analysis. The analysis to determine whether functional issues with the current design exist or not, i.e. Design confirmation, or where design issues are identified, through coord with the Client, adjust the design via proposed improvements to mitigate operational / functional issues. |
|
|
Finish
Dec 2014 - Dec 2015 |
8001-5 | ENSCO - Engineering Review for replacement Duty Generator Set at Rig | - | Offshore Jakarta, Indonesia | ENSCO (USA) |
|
|
1. Review of the existing structure and differences for the new Generator Set. 2. Site review and site engineering as necessary to support the placement of the new Generator Set with respect to structure and the associated dynamic loads. 3. Development of short engineering report with sketches / drawings as necessary to support the works. |
|
|
Finish
Dec 2016 - Dec 2017 |
5046 | Lihir Island 240 MW Power Options Study Stage #2 | - | Lihir Island PNG | Newcrest Mining Limited (Australia) |
|
|
Development of power plant options to augment current generation onsite. Workscope includes technologies, feasibility, capital & operating cost & recommendations. Basis is 150-250MW Power plants based on HFO, LNG and Coal Fired technologies. |
|
|
Finish
Nov 2021 - Dec 2021 |
3176 | Ojoali (bukit Jambi) Heap Leach Gold Project Definitive Feasibility Study (DFS) | - | South Sumatra, Indonesia | PT Batutua Lampung |
|
|
DFS development for the Ojolali Gold Heap Leach Project. Scope of Work includes process design, crushing & Materials Handling Design, overall plant & facilities design and specification including 20kV distribution, substation development and interfacing with PLN for substation connections and protection, procurement for main equipment, Capex, Opex etc. Resindo will integrate the work from other specialist Consultants for mine Design, Geotech, Hydrology, Environment etc. to form a complete DFS Report for financing. |
|
|
Finish
Dec 2016 - Dec 2017 |
5043 | Lihir Island 240 MW Power Options Review Stage #1 | - | Lihir Island PNG | Newcrest Mining Limited (Australia) |
|
|
Workscope includes the review of previous studies by 3rd parties with respect to technologies, feasibility, capital & operating cost reviews, gap identification & recommendation for way forward. Basis is 150-250MW Power plants based on HFO, LNG and Coal Fired technologies . |
|
|
Finish
Jan 2021 - Jan 2021 |
3204 | Poboya Thickener Fabrication Management | - | Jakarta Indonesia | PT. Metso - Outotec Indonesia (& M:O Australia) |
|
|
Resindo was engaged for the fabrication management and reporting for the progressive manufacture of two thickeners for two different gold Projects on behalf of Metso - Outotec. |
|
|
Finish
Jan 2021 - Dec 2021 |
3207 | Process Plant Water Supply Pipeline Optimisation | - | Sulawesi, Indonesia | PT Golder Indonesia For PT Petrosea TbK |
|
|
Review of the FEED solution and determine if the pipeline can be optimised to reduce costs with respect to pipeline materials and foundations along steep incline route. For revised positioning of the Process Plant a second package was awarded for further review and design optimisation of the pipeline material, pump pressures, materials, footings to reduce price. |
|
|
Finish
Dec 2013 - Dec 2014 |
8001 | ENSCO Drill Rig Upgrades & Modifications Pkge #2 | - | Offshore Jakarta, Indonesia | ENSCO (USA) |
|
|
Site investigation, engineering & development of deliverables for structural, mechanical and electrical works for Rig 67 to international O&G standards. |
|
|
Finish
Dec 2013 - Dec 2014 |
8002 | ENSCO Drill Rig Upgrades & Modifications Pkge #1 | - | Offshore Jakarta, Indonesia | ENSCO (USA) |
|
|
Site investigation, engineering & development of deliverables for structural, mechanical and electrical works for Rig 56 to international O&G standards. |
|
|
Finish
Jan 2021 - Dec 2021 |
3190 | Toka Tindung Gold Process Plant Expansion - Scats Crusher EPCM | - | Northern Sulawesi Indonesia | PT Tambang Tondano Nusajaya (TTN) |
|
|
Working as an integrated team with Como Engineers (Australia). Resindo was engaged for the EPCM expansion for the current gold processing facility – Demolish old Scats Crusher, EPCM for the new expanded capacity one. Workscope included (EPCM); Detailed Design, Procurement support (RFQ’s, TBE’s, CBE’s, etc.) then Construction Mgt for the realisation of the work. Resindo provided a number of Site Construction Management personnel including discipline Project Engineers, Site Mgr for the final period of the Works, HSE & QA personnel, etc., as well as fabrication shop inspections & monitoring, FATs, etc. from Jakarta |
|
|
Finish
Jul 2022 - Jul 2023 |
3192 | Kolosori Nickel Shipment of Ore (DSO) Bankable Feasibility Study / Construction Design | - | Kolosori, Solomon Islands | Pacific Nickel Mines Limited (Australia, ASX) |
|
|
Resindo was engaged to undertake the BFS for the DSO development. Works included Barge Port, Stockpiles, Mining Facility, Haul Roads, Camp, Capex, Opex and coordination with 3rd Party Consultants to form an overall BFS Report. Work extended to include construction design for the mining infrastructure and port for fast start-up. |
|
|
Finish
Dec 2016 - Dec 2017 |
5042 | Sidrap Wind Farm Consulting Engineering | - | Sulawesi Indonesia | UPC (Australia) / Buma |
|
|
The Sidrap Wind Farm Project is the first commercial wind farm in Indonesia, with a capacity of 75 MW. The project includes the installation of 30 wind turbines, each with a capacity of 2.5 MW. The primary goal of the project was to contribute to the nation’s renewable energy targets, providing sustainable and clean energy to the grid. Resindo was engaged on behalf of the Owner’s site team by the Contractor BUMA to review, report and supervise contractor works: 1) Electrical equipment remediation. 2) Civil foundation integrity / strength review and remediation. A major factor of these works was investigation, remediation design and methodologies for incorrectly constructed Wind Tower foundations / quality. The result was acceptance by the Owner and Contractor and Project works were then completed. |
|
|
Finish
Jan 2021 - Dec 2021 |
3198 | Awak Mas Gold Project – Gov FS Amendment | - | South Sulawesi Indonesia | PT Masmindo Dwi Area – Nusantara Resources Ltd (Aus) (ASX) |
|
|
Resindo was engaged to work with the Client to develop the submission letter to the Government for the comparison between previous approved Gov FS and changes based on the FEED and optimisation work undertaken in 2020/2021. |
|
|
Finish
Dec 2013 - Dec 2014 |
3055 | Wetar Copper Project – Demonstration Process Plant 3ktpa Restart | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2015 - Dec 2016 |
5027 | CENPRI IPP 25MW MFO / HFO Power Plant Project | - | Bago City Negros Island Philippines | Energreen Group (Philippines) |
|
|
Resindo working with SEM Energy Ltd for the design and construction of a refurbished MFO / HFO power plant. Work included the detailed design for the electrical, mechanical and structural works for the MFO system, cooling system, piping, switchyard etc., supervision of electrical panel & system refurbishment, mechanical and electrical site supervision / review during construction. Project was fast track with very tight time frame to meet clients IPP contract commitment for grid supply. |
|
|
Finish
Jan 2021 - Dec 2021 |
3184 | Awak Mas Gold Project – Infrastructure FEED | - | South Sulawesi Indonesia | PT Masmindo Dwi Area – Nusantara Resources Ltd (Aus) (ASX) |
|
|
Resindo is engaged to undertake the following FEED & selected detail design works for Petrosea, the EPC contractor / financier of the project; Bulk Earthworks for all facilities including RoM, Process Plant, Support Facilities & Site Road design – FEED & Detailed Eng. Magazine, CSR & Security, Main process Plant & Administration offices, laboratory, process warehouse, Offsite facilities including major Core Sheds, Warehouse, Office etc. |
|
|
Finish
Dec 2013 - Dec 2014 |
1063 | BAR Coal Port Development PFS | - | East Kalimantan, Indonesia | PT. Bumi Alam Raya (BAR) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2024 - Dec 2022 |
3212 | Jejevo Nickel Shipment of Ore (DSO) Pre-Feasibility Study (PFS) | - | Jejevo, Solomon Islands | Pacific Nickel Mines Limited (Australia, ASX) |
|
|
Resindo undertook the PFS for the DSO development. Works included Barge Port, Stockpiles, Mining Facility, Haul Roads, Camp, Capex, Opex and coordination with 3rd Party Consultants to form an overall PFS Report, submitted to the SI Government, review by Australian Consultants. |
|
|
Finish
Dec 2013 - Dec 2014 |
1065 | Coking Coal Mine Bankable Feasibility Study (BFS) Coordination & Engineering | - | Central Kalimantan Indonesia | Cokal Coal (ASX Listed) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2020 - Dec 2020 |
3175 | Toka Tindung Gold Process Plant Expansion FEED | - | Northern Sulawesi Indonesia | PT Tambang Tondano Nusajaya (TTN) |
|
|
Working as an integrated team with Como Engineers (Australia) Resindo was engaged for the FEED expansion for the current gold processing facility. COMO is the lead for Process design. Workscope includes Design and procurement support for the realisation of the work |
|
|
Finish
Dec 2012 - Dec 2013 |
- | Palaran River Coal Terminal Study | - | East Kalimantan, Indonesia | Mesra Group |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2015 - Dec 2016 |
5039 | Mini Hydro Power Bantarkawung 1&2 Tech Review | - | Sulawesi, Indonesia | PT. Bruder Bebas Indonesia |
|
|
Technical review of two (2) Mini Hydro Studies on behalf of Owner: Brebes Study 2 x 3.7 MW & Brebes Study 2 x 2.6 MW. |
|
|
Finish
Dec 2012 - Dec 2013 |
- | Nickel Process Plant & Infrastructure GFS – Bulk Fuel Farm | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2019 - Jan 2019 |
3173 | Lebong Heap Leach Gold Process Plant Construction Design | - | Sumatra, Indonesia | PT Sugico |
|
|
Construction level design for small scale Gold Heap Leach Project. Minimal design approach and utilise site contractors to site run services as practical. Scope of work includes process design, overall plant & facilities design and specification, procurement for main equipment, etc. and Capex for use as project budget. |
|
|
Finish
Dec 2012 - Dec 2012 |
3058 | Nickel Process Plant & Infrastructure - GFS | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2015 - Dec 2016 |
3009 | Mini Hydro Pre-Feasibility Study | - | Southern Sulawesi, Indonesia | PT Masmindo Dwi Area (MDA) –Pan Asia Resources (Aus) |
|
|
Resindo undertook the PFS to determine the options and costs of a mini hydro power plant to provide auxiliary power to the developing Gold Process Plant and Infrastructure. The Study involved review of the various technologies that would provide the optimum solution including Penstock System with Impulse Turbine (Pelton) and Barrage System with Reaction Turbine (Kaplan), coordinating with the Vendors and utilising the river flow rates and levels provided by Golder. The outcome was a power supply of 800kW to 1.2 MW subject to the season and rainfall in the catchment areas. The Capex and Opex was developed and formed part of the overall PFS Works. |
|
|
Finish
Jan 2019 - Dec 2019 |
3174 | Batu Hijau’s Elang Area Infrastructure Definitive Feasibility Study (DFS) | - | Sumbawa Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) |
|
|
Resindo is undertook the DFS for Elang infrastructure. New pit development for the Batu Hijau Process plant. Work includes basic engineering, Capex, Opex and all associated engineering / technical works for the; Haul Roads, Access Roads & Bridges, Camp, Mining Workshops, Bulk Fuel Storage & Dispensing, HV Transmission, HV Substation, MV-LV Distribution, Water and Waste Water Supply, Treatment & Distribution, etc. |
|
|
Finish
Jan 2018 - Jan 2019 |
3153 | Ak Zug Copper Project Development Technical Review Process Plant Infrastructure, Transport & Power | - | Russia | Intergeo (Russia) |
|
|
Resindo as part of a consortium is undertaking a detailed technical review of the project development studies and plans for the project. Scope of Work includes review and alternatives for; Process options, Transport-Haulage options including alternative Haul road alignments, Railway, 220kV power transmission corridor, geotechnical & TSF review and optimisation plans. Geotechnical and TSF works all by PT GRM |
|
|
Finish
Dec 2011 - Dec 2012 |
3024 | Morowali Nickel HPAL Process Plant & Support Infrastructure Study (PFS & GFS) | - | Sulawesi, Indonesia | Ausenco Vector (Aus) / Bumanik (Indonesia) - |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Mar 2023 - Mar 2022 |
3211 | CMSA Cerro Matoso – South 32: Nickel Heap Leach Study | - | Colombia, South America | Worley Ltd (ASX, Australia) |
|
|
Resindo’s Principal Process Engineer, working under Worley undertook the process design in addition to our Design office producing the Process Flow Diagrams (PFD’s) to support the Worley Study Works. Previously CSMA was owned by BHPB Billiton. Divested in 2015 to South32 Perth, Australia. |
|
|
Finish
Dec 2018 - Dec 2019 |
3168 | Toka Tindung Pit Dewatering Anchor System | - | North Sulawesi, Indonesia | MSM / TTN (Tokatindung) |
|
|
Resindo is undertaking the design of anchors for pipelines and cables for in-pit systems as part of the Pit Dewatering system. Includes static and dynamic calculation for the supports together with their design. |
|
|
Finish
Dec 2015 - Dec 2016 |
5012/5013 | SAPT 20MW HSD Power plant & Fuel Farm Design & Verification Engineering | - | Karachi, Pakistan | HPH, Hutchison Port Holdings (Hutchison Whampoa Group) (HK) |
|
|
Resindo was engaged to undertake detailed verification review engineering for basic and detailed engineering for a HK-Chinese Joint Venture for 20MW HSD power plant including powerhouse, fire fighting facilities, fuel farm and related infrastructure all to British Standards. Work extended to include mentoring the third party engineering works. |
|
|
Finish
May 2021 - May 2022 |
3203 | Tailings Dry Stacking Study | - | Perth Australia | BHP Australia |
|
|
Working as part of an international Team for the; Investigation and development of Dry Stacking of Tailings in place of wet TSF’s to improve the Environment and Safety. Work is being undertaken by our Process Principal (international) working with the BHP Team and their other specialist Consultants |
|
|
Finish
Dec 2015 - Dec 2016 |
3091 | Nickel Process Plant - Coal Fired Power Plant DFS | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Dual Coal Fired Power Plant formed part of overall scope. Power plant engineering was advanced to the point of tender and ready for project implementation. Refer complete project description. |
|
|
Finish
Dec 2011 - Dec 2012 |
- | Nickel Plan Development | - | Southern Sulawesi | PT. Ceria Nugraha Indotama (CNI) (Indonesia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2019 - Dec 2019 |
3171 | Awak Mas 2.5 mtpa Gold Project – Update for Government Feasibility Documents | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – One Asia Resources / Nusantara Resources Ltd (Aus) (ASX) |
|
|
Resindo updated the various technical sections for the Government approved Feasibility Study reflecting the outcomes of the latest DFS. |
|
|
Finish
Dec 2014 - Dec 2015 |
3100 | Nickel Smelter Project; Coal Fired Power Plant PFS | - | Halmahera & West Java Indonesia | Posco |
|
|
Power plant formed part of overall scope. Refer complete project description. |
|
|
Finish
Jun 2021 - Jun 2022 |
3208 | Bahodopi & Pomalaa Ni Laterite Mine FEL3 Infrastructure Review & Optimisation Options Identification & Development | - | Central Sulawesi Indonesia | PT Vale Indonesia |
|
|
Resindo is undertaking the initial review of two (2) larger nickel laterite sites for the FEL3 mining infrastructure with the intent to identify potential areas of major cost reduction through analysis, alternative layout plan and elevations and Capex development. Work includes Mining Workshops, Mining Support Facilities, Haul Roads and Barge Ports at each Site. Work extended to design development, tender technical SoW development, Capex development. |
|
|
Finish
Dec 2011 - Dec 2012 |
3005 | Awak Mas Gold Development Study (& used for GFS) | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – Pan Asia Resources (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2018 - Dec 2018 |
3146 | Awak Mas 2.5 mtpa Gold Project Definitive Feasibility Study (DFS) | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – One Asia Resources / Nusantara Resources Ltd (Aus) (ASX) |
|
|
Resindo was the overall DFS lead / Coordinator. Resindo was also responsible for; Mining & Process Plant Infrastructure, ore conveying system works and overall integration for use in Client project finance model. over steep terrain, Bulk Fuel Farm, bridges, roads, ports, 150kV PLN extension & substation, Capex & Opex for these |
|
|
Finish
Dec 2011 - Dec 2012 |
3041 | Bakan Gold Project Design to Construction Level (IFC) | - | North Sulawesi, Indonesia | PT J Resources Bolaang Mongondow (Indonesia) (PSAB : IDX) (Previously Avocet - Britain) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2018 - Dec 2018 |
3146 | Sangihe Gold Project (Government) Feasibility Study | - | Sangihe Island Indonesia | East Asia Minerals (Canada |
|
|
Heap Leach Gold project. Resindo is responsible for Process Design, Testwork, Infrastructure, Power generation, Capex, Opex, Financial Model, overall Feasibility Study development in dual language – all undertaken in-house. Resindo then coordinates the third party specialists; Mining Consultant, Geotech & hydrogeology Consultant, Drilling Contractor, Test Laboratory, AMDAL Consultant. |
|
|
Finish
Jan 2014 - Jan 2015 |
3047 | Awak Mas 2.5 mtpa Gold Project Pre-Feasibility Study (PFS) Update – Coal Fired Power plant | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – One Asia Resources (Aus) |
|
|
Coal Fired Power plant formed part of overall scope. Refer complete project description. |
|
|
Finish
Mar 2021 - Mar 2022 |
3200 | Iron Sands Concentrate 1mtpa Process Plant Design PFS | - | Central Java, Indonesia | PT. Jogja Magasa Iron (Indonesia) / Indomines (Australia) |
|
|
Resindo working jointly with the Client to develop the process plant for 1mtpa at PFS level. Work included design, capital estimates, equipment (mill, magnetic separators, etc.) from initial bulk earthworks, stockpiles, roads, to process plant & process infrastructure. |
|
|
Finish
Dec 2011 - Dec 2012 |
3073 | Pani Gold Project PFS (GFS – Government Feasibility Study) | - | Nth Sulawesi, Indonesia | PT J Resources Nusantara (Indonesia) (PSAB : IDX) (Previously Avocet - Britain |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2018 - Dec 2018 |
3156 | BTR Crusher 21 Upgrade Scoping | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Review and if feasible a Study to increase the capacity of Crusher 21 to approximately 400 tph. |
|
|
Finish
Dec 2011 - Dec 2012 |
1031 | Malinau Master Plan Development; Operating Coal Mine Expansion | - | East Kalimantan | PT. Baradinamika Mudasukses (Baramulti Group) (Indonesia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2014 - Jan 2015 |
3107 | IMK Gold Process Plant Condition review – Coal Fired Power Plant | - | Kalimantan Indonesia | Reserves Consultant (Indonesia) |
|
|
Power plant formed part of overall scope. Refer complete project description. |
|
|
Finish
Dec 2011 - Dec 2012 |
- | Copper Process Plant Expansion BFS Update | - | Wetar Is, Maluku, Indonesia | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2013 - Dec 2014 |
5026 | Mauritius 60MW MFO Power Plant System – EPC Tender Preparation including Basic Design | - | Republic of Mauritius | AVIC-Intl (China) |
|
|
Tender development including engineering for Redevelopment of the Saint Louise Power Station; demolition of existing facilities, new 4X15 MW MFO Diesel Engine system, power house, Bulk Fuel facilities together with all auxiliaries. Detailed capital estimate. Tender was discontinued prior to submission by Client. |
|
|
Finish
Feb 2021 - Feb 2022 |
3197 | Bahomoahi Ni Laterite Mining (Gov) Feasibility Study | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo Works included; Haul Road, Mining workshops / offices / infrastructure, Camp, power via 20kV and diesel Genset plant backup and supply for remote area, fuel facilities, etc. and Capex development. Work included integrating the inputs from various other consultants; Geotech, Hydrology, Mine Reserves, Mine Planning, Community, Financial Model, etc. to form a Report inline with Gov requirements for approval to move to implementation. |
|
|
Finish
Jan 2018 - Dec 2018 |
3161 | Copper Project Materials Handling System Engineering Support to Operations | - | Central Kalimantan Indonesia | Asiamet / KSK |
|
|
Development of captive power plant, bulk fuel storage workshops, warehouses, magazine and related infrastructure for mining & process plant. Workscope includes DFS design, capital & operating costs. |
|
|
Finish
Dec 2010 - Dec 2011 |
3032 | Agata Nickel Process Plant & Support Infrastructure (PFS) | - | Philippines | Mindoro Resources Ltd. (Philippines) Ausenco Minerals & Ausenco Vector (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2013 - Dec 2014 |
5004 | Wetar Copper Project – MFO Power Plant Refurbishment China | - | Southern China | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Resindo was engaged to undertake design review of the HK-Chinese Contractor engineering for the 20MVA MFO / HFO Power plant including placing two engineers during the refurbishment works in China to monitor methodologies and the quality of the Contractor’s works. Workscope included providing technical support to both BTR in Indonesia & China and SGS (China) who BTR-Contractor engaged for some certified inspection services. (Ref No. 5004). |
|
|
Finish
Jan 2018 - Dec 2018 |
3159 | Copper Project Transport & Logistics Upgrade for Copper Project Study DFS | Copper Project Transport & Logistics Upgrade for Copper Project Study DFS | Central Kalimantan Indonesia | Asiamet / KSK |
|
|
Development of transport via river (300km) and access road to site (70km), new river port, river bathymetry for vessel access specification and transport operational costs for the copper process plant at a remote site. Workscope includes DFS design, capital & operating costs. ( |
|
|
Finish
Dec 2012 - Dec 2013 |
3030 | Wetar Copper Project – MFO Power Plant DFS | - | Wetar Is, Maluku, Indonesia | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Power plant formed part of overall scope. Refer complete project description. |
|
|
Finish
Jan 2018 - Jan 2018 |
3156 | BTR Crusher 21 Upgrade Scoping | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Review and if feasible a Study to increase the capacity of Crusher 21 to approximately 400 tph. |
|
|
Finish
Jan 2018 - Dec 2018 |
3155 | Gold Process Plant Upgrade -Fabrication Inspection | - | North Sulawesi, Indonesia | Lycopodium (Australia) |
|
|
Fabrication inspections on behalf of Lycopodium for the Toka Tindung Gold Project. Sourcing of local materials and suppliers to support Lycopodium at site. |
|
|
Finish
Jan 2018 - Dec 2018 |
3154 | Copper Project Materials Handling System Engineering Support to Operations | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Supporting Client with engineering inputs for their operations and maintenance activities for the 25ktpa MHS plant |
|
|
Finish
Dec 2020 - Dec 2021 |
3183 | Nickel Cobalt Process Plant DFS | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo working jointly with the Client is undertaking the process infrastructure and balance of plant design for the smelter development. RKEF by Chinese Vendor, Civil Works design by Resindo. Balance of Resindo works includes; process plant infrastructure, crushing and materials handling systems, infrastructure; port, power including MV distribution & substation, interfaces with PLN, site prep, haul and access roads, quarry, camps, etc. Includes project & construction management of the works packages. SoW extended to include the relocation, refurbishment & commissioning of 2nd hand Chinese Vendor quarry crushing systems, magnetic separators and other selected process equipment. ( |
|
|
Finish
Jan 2018 - Dec 2018 |
3161 | Copper Project Non Process Infrastructure (NPI) #2 Study DFS | - | Central Kalimantan Indonesia | Asiamet / KSK |
|
|
Development of captive power plant, bulk fuel storage workshops, warehouses, magazine and related infrastructure for mining & process plant. Workscope includes DFS design, capital & operating costs. |
|
|
Finish
Jan 2018 - Dec 2018 |
3159 | Copper Project Transport & Logistics Upgrade for Copper Project Study DFS | - | Central Kalimantan Indonesia | Asiamet / KSK |
|
|
Development of transport via river (300km) and access road to site (70km), new river port, river bathymetry for vessel access specification and transport operational costs for the copper process plant at a remote site. Workscope includes DFS design, capital & operating costs. |
|
|
Finish
Jan 2020 - Dec 2021 |
3197 | Sorowalio Nickel DSO DFS & FEED | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo works included; new coastal barge port, new Haul Road, upgrade existing road section, new mining and workshop facility, new fuel storage & dispensing facilities, refurbishment and expansion of two (2) camps, WTP;s STPs, raw water pump stations & pipelines, 20kV substation and power distribution including PLN interfaces, site prep, etc. Ore will be barged to Client Smelter Barge Port, trucked to smelter stockpiles (refer Project 3183 ). |
No Image |
|
Finish
Jan 2020 - Jan 2021 |
3186 | Tin Smelter - Civil & Geotech Design Review | - | Bangka Is. Indonesia | PT TIMAH (Persero) |
|
|
Resindo worked with PT TIMAH to review the Contractor’s detailed design and methodology for the civil (including geotech review) and methodology for the Australian TSL Ausmelt Furnace Construction at site. |
|
|
Finish
Jan 2017 - Dec 2017 |
3157 | BTR Crusher 21 Upgrade DFS | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Review and if feasible a Study to increase the capacity of Crusher 21 to approximately 400 tph |
|
|
Finish
Jan 2019 - Jan 2020 |
3185 | Iron Sands Concentrate Process Plant 50tpa Design & Refurbishment | - | Central Java, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo worked jointly with the Client to develop the process plant and supporting infrastructure. Work included design, procurement, capital estimates, new and refurbished equipment (mill, magnetic separators, etc.) from initial bulk earthworks, stockpiles, roads, to process plant & support facilities. Project did not proceed to construction. |
|
|
Finish
Jan 2018 - Dec 2018 |
6054 | Hu’u Copper Exploration Camp Expansion Pkge #2 EPC | - | Sumbawa Indonesia | Vale Exploration (Australia) |
|
|
Resindo has been awarded Pkge #2 for the existing facilities expansion in Sumbawa. Works includes accommodation and shower blocks, offices, coresheds, genset house and helicopter hangar. All materials are preferred and sourced from local sources using local labour recruited by our team |
|
|
Finish
Dec 2019 - Dec 2020 |
3187 | Tin Smelter – Oxygen Plant Review | - | Bangka Is. Indonesia | PT TIMAH (Persero) |
|
|
Resindo worked with PT TIMAH to review proposals for the new smelter oxygen plant. Review included technical and commercial aspects for proposals submitted with a general industry comparison. |
|
|
Finish
Jan 2010 - Dec 2011 |
3045 | Morowali Nickel Heap Leach Process Plant & Support Infrastructure | - | Sulawesi, Indonesia | Bumanik (Indonesia) (PSAB : IDX) - Ausenco Vector (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2017 - Dec 2017 |
3151 | Copper Project Materials Handling System Engineering Support to Operations - Screen Options | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Supporting Client with engineering inputs for their operations and maintenance activities for the copper project. Basic engineering and capital costs for screen to support production updates |
|
|
Finish
Jan 2017 - Dec 2017 |
3142 | Batu Hijau Processing Options Scoping Study | - | Batu Hijau Sumbawa Indonesia | PT Amman Mineral Nusa Tenggara (AMNT) (Previously Newmont) |
|
|
Resindo working with Aurecon Indonesia is engaged to undertake the Process options for throughput expansion. Work includes Process Plant layouts, Plant design, OLC, Slurry pipeline, Capex & Opex. Outotec is undertaking the milling circuit design. Resindo coordinates the third party specialists for TSF & Geotech, milling and slurry pipeline Vendor. |
|
|
Finish
Jan 2010 - Dec 2011 |
3011 | Gag Island Nickel Process Plant & Supporting Infrastructure Study | - | Gag Island, Maluku, Indonesia | Antam (Indonesia) Ausenco Vector (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2019 - Dec 2020 |
3182 | Tin Smelter Basic / Owners Estimate Review | - | Bangka Is. Indonesia | PT TIMAH (Persero) |
|
|
Resindo worked with PT TIMAH to review their Project’s Owners Estimate, methodology, buildup, engineering details, quotations, basis for estimate etc to support the basis for tenders and negotiation. |
|
|
Finish
Jan 2010 - Dec 2011 |
3024 | Morowali Nickel – Direct Ore Shipment (DOS) Development Study | - | Sulawesi, Indonesia | Bumanik (Indonesia) (PSAB : IDX) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Dec 2020 - Jan 2021 |
3188 | Nickel Plant PFD Drafting | - | Australia | Tasmanian Minerals (Australia) |
|
|
Resindo is supporting the Client Process Team through the drafting of Process PFD’s for a developing Nickel Project DFS. |
|
|
Finish
Dec 2018 - Jan 2019 |
3160 | Tin Smelter Basic / FEED BOP Engineering | - | Bangka Is. Indonesia | PT TIMAH / Outotec (Australia / Germany) |
|
|
Resindo working under Outotec Australia and Germany undertook the FEED Balance of Plant Basic Design for the new Ausmelt Tin Smelter. Works include materials handling systems, new and refurbished, structural, mechanical, electrical design, with Capex development. |
|
|
Finish
Jan 2010 - Dec 2011 |
3025 | Dampala Nickel Plant; Process Plant & Supporting Infrastructure Study. | - | Sulawesi, Indonesia | TransAsia (Indonesia) – Ausenco Vector (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2017 - Dec 2017 |
6054 | Hu’u Copper Exploration EPC Camp Expansion Pkge #1 | - | Sumbawa Indonesia | Vale Exploration (Australia) |
|
|
Resindo working with SMEC has been awarded Pkge #1 for the existing camp facilities expansion in Sumbawa. Works includes accommodation and shower block. All materials are preferred and sourced from local sources, must be airlifted in by helicopter to the remote hill site with no road access, constructed using local labour recruited by our team. |
|
|
Finish
Jan 2018 - Jan 2019 |
3181 | Iron Smelter Capital Estimate | - | Jogja, Indonesia | PT Jogja Magasa Iron / Indomines (Indonesia / Australia) |
|
|
Supporting JMI in the provision of local Indonesian pricing details; equipment, materials, gang rates for supply & install, etc. for major Chinese Investor and equipment provider review. |
|
|
Finish
Jan 2010 - Dec 2011 |
- | Coal Port Location, Infrastructure & Capacity Scoping Study | - | East Kalimantan, Indonesia | Param Mitra Resources Pte. Ltd./ Daun Resources (India/ Netherlands) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2017 - Dec 2017 |
3138 | Rare Earths Process Plant Scoping Study | - | Belitung Indonesia | Core (Australia) |
|
|
Resindo has been awarded two packages; 1. Process engineering support & details for process plant. 2. Engineering support, Capex & Opex development |
|
|
Finish
Jan 2010 - Dec 2011 |
1032 | Coal Port Location, Infrastructure & Capacity Scoping Study | - | East Kalimantan, Indonesia | Param Mitra Resources Pte. Ltd./ Daun Resources (India/ Netherlands) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2010 - Dec 2011 |
1027 | Coal Mine Master Development Plan, Basic & Detail Engineering | - | East Kalimantan, Indonesia | PT Antang Gunung Meratus - Baramulti Group (Indonesia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2009 - Dec 2010 |
3038 | Aquila Nickel Mine Infrastructure Study (PFS) | - | Sulawesi, Indonesia | Solway (Russia) - Ausenco Vector (Aus) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2018 - Dec 2019 |
3164 | Nickel Cobalt Process Plant Atmospheric Tank Leach (ATL) Technology - EPCM | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo working jointly with the Client was undertaking the process, infrastructure and balance of plant design for the smelter development. Works included process plant, crushing and materials handling systems, infrastructure; port, power including MV distribution & substation, interfaces with PLN, site prep, haul and access roads, quarry, camp, etc. Includes project & construction management of the works packages. |
|
|
Finish
Jan 2017 - Dec 2017 |
3137 | BTR V_Slot Machining | - | Wetar island, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Design for Machining area, provision of Fitters & coordination for the V-Slot Electrode machining works. Cutting an approximate 16mm strip off the bottom of each cathode and Machining a V-notch into the bottom edge |
|
|
Finish
Jan 2016 - Dec 2016 |
3089 | Gunung Rosa Gold Plant Process Update Scoping / PFS Study | - | West Java, Indonesia | GMT |
|
|
Resindo undertook the Process Plant upgrade to current technology. Work includes layouts, PFD’s, Mech, E&I, Civil & Structural engineering in addition to Capex & Opex for the overall plant. All undertaken in-house Work was extended to include paste plant & mining infrastructure. Study level increased to PFS for Resindo works. |
|
|
Finish
Jan 2016 - Dec 2016 |
3089 | Gunung Rosa Gold Plant Process Update Scoping / PFS Study | - | West Java, Indonesia | GMT |
|
|
Resindo undertook the Process Plant upgrade to current technology. Work includes layouts, PFD’s, Mech, E&I, Civil & Structural engineering in addition to Capex & Opex for the overall plant. All undertaken in-house Work was extended to include paste plant & mining infrastructure. Study level increased to PFS for Resindo works. |
|
|
Finish
Jan 2018 - Dec 2019 |
3167 | Nickel Cobalt Process Pilot Plant | - | Jakarta, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo working jointly with the Client is undertaking the process and balance of plant design for the Pilot Plant. As part of this work Resindo will provide construction coordination for the plant in Jakarta’s industrial Zone. |
|
|
Finish
Jan 2017 - Dec 2018 |
3166 | Lead Zinc Balance of Plant Scoping Study | - | Romang Island, Maluku Indonesia | PT Gemala Borneo Utama |
|
|
Development of basic information to support Capex development for Scoping Level Study for the Lead Zinc smelter Balance of Plant. The smelted is based on an Ausmelt furnace system. |
|
|
Finish
Jan 2016 - Dec 2016 |
3122 | Wetar Copper Plant Electrolytic Upgrade Engineering | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Design for upgrade and expansion of the electrolytic system for the 3ktpa SX-EW plant. |
|
|
Finish
Jan 2016 - Dec 2016 |
3056 | Wetar Copper Main Plant 25ktpa Implementation Phase EpCM | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Working with BTR/Finders implementation team & their consultants/contractors for the support & development of the project. Resindo’s workscope includes providing services and also augmenting the Client’s team for: 1. Ore leach pads. 2. Wharf, berthing and associated Fuel handling systems, bulk fuel tankage, design & site supervision. 3. Infrastructure; airstrip warehouse, camps, workshops, fuel systems, etc. 4. General engineering support from Jakarta & Site as required for implementation, fab shop floor supervision Surabaya. Contract development, technical equipment inspection services, etc. Site construction management integrated with Client Team. |
|
|
Finish
Jan 2015 - Dec 2015 |
6038 | Wetar Cu Thickener Fabrication Supervision | - | Wetar Is, Maluku, Indonesia | PT. Outotec Indonesia |
|
|
Fabrication Supervision supporting Outotec for Thickener for Copper Process Plant at Wetar. |
|
|
Finish
Jan 2016 - Dec 2016 |
3047 | Awak Mas 2.5 mtpa Gold Project Pre-Feasibility Study (PFS) - Preliminary Update | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – One Asia Resources (Aus) |
|
|
Update previous PFS for current economic conditions includes; Update capital and operating estimates, financial model for: Mining & Process Plant Infrastructure, ore conveying system over steep terrain, Bulk Fuel Farm, bridge, Coal Fired Power Plant & coal handling facilities. |
|
|
Finish
Jan 2016 - Dec 2016 |
3115 | Gold Plant Expansion Engineering | - | Mirah, Indonesia | PT. Kasongan Bumi Kencana (KBK) |
|
|
Supporting the KBK Process Team, Resindo is undertaking design works to support the process plant expansion with support facilities including Civil, Structural, Mechanical, Electrical & Instrumentation Design together with general engineering support. Current Package – New Crusher System |
|
|
Finish
Jan 2016 - Dec 2016 |
3115 | Gold Plant Expansion Engineering | - | Mirah, Indonesia | PT. Kasongan Bumi Kencana (KBK) |
|
|
Supporting the KBK Process Team, Resindo is undertaking design works to support the process plant expansion with support facilities including Civil, Structural, Mechanical, Electrical & Instrumentation Design together with general engineering support. Current Package – New Crusher System |
|
|
Finish
Jan 2016 - Dec 2016 |
3115 | Gold Plant Expansion Engineering | - | Mirah, Indonesia | PT. Kasongan Bumi Kencana (KBK) |
|
|
Supporting the KBK Process Team, Resindo is undertaking design works to support the process plant expansion with support facilities including Civil, Structural, Mechanical, Electrical & Instrumentation Design together with general engineering support. Current Package – New Crusher System |
|
|
Finish
Jan 2016 - Dec 2016 |
3115 | Gold Plant Expansion Engineering | - | Mirah, Indonesia | PT. Kasongan Bumi Kencana (KBK) |
|
|
Supporting the KBK Process Team, Resindo is undertaking design works to support the process plant expansion with support facilities including Civil, Structural, Mechanical, Electrical & Instrumentation Design together with general engineering support. Current Package – New Crusher System |
|
|
Finish
Jan 2015 - Dec 2015 |
3123 | Copper Plant PEA Logistics Study | - | Kalimantan, Indonesia | Asiamet |
|
|
Investigation of route options for the transport during construction and operations for Plant equipment, steel, reagents, export of product. Tradeoffs for barging and trucking including infrastructure locations, capital & operating costs. LNG supply options for power plant |
|
|
Finish
Jan 2015 - Dec 2015 |
3021 | Ciemas Gold Project PFS Study Support – Design Drafting | - | Sukabumi, Java Indonesia | PT Geoservices Indonesia |
|
|
Design Drafting services for Process Flow Diagrams for the Wilton Ciemas Gold Plant Study |
|
|
Finish
Jan 2015 - Dec 2015 |
3106 | Toka Tindung Gold Process Plant Minor Expansion Works | - | Sulawesi Indonesia | PT. Meares Soputan Mining (MSM) |
|
|
Undertaken process plant upgrade engineering works for construction contractors to implement; Crushing system upgrade, CIL tank modifications, modify and new piping systems with airlift, electrical modifications. Work involves site measurement & design for piping systems with balance undertaken in our Jakarta design office |
|
|
Finish
Jan 2015 - Dec 2015 |
3087 | Ojolali Gold Project GFS Update | - | Lampung, South Sumatra, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Process Plant Government Feasibility Study including; crushing, agglomeration; Heap leaching, process plant incorporating a modular elution/electrowinning plant, detoxification plant treating excess cyanide, capital and operating cost estimates |
|
|
Finish
Jan 2015 - Dec 2015 |
3107 | IMK Gold Process Plant Condition review | - | Kalimantan Indonesia | Reserves Consultant (Indonesia) |
|
|
Supporting Technical Due Diligence for equipment condition review of shutdown Gold Plant and estimated restart costs including Coal Fired Power Plant |
|
|
Finish
Jan 2014 - Dec 2014 |
3055 | Wetar Copper Project – Demonstration Process Plant 3ktpa Restart | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya, Finders Resources Limited (Aus) (ASX: FND) |
|
|
Restart & Upgrade of the existing 3ktpa Process Plant. Design, Procurement & Construction Supervision jointly with BTR Personnel of; 1. HSD Fuel System including bulk tank 2. Genset & Synchronisation, Distribution System 3. Process Plant pump upgrades, additional cells, cranes. 4. Spent ore pad, ore disposal, new HL pad development. 5. Refurbishment of Crushing & Stacking system for initial campaign (UDP) Upgrade of Crushing & Stacking system for Gold Pad HL area (GPHL). |
|
|
Finish
Jan 2014 - Dec 2014 |
3075 | Penjom Gold Plant Expansion EPCM | - | Kuala Lipis, Malaysia | PT J Resources Bolaang Mongondow / JResources Group (Indonesia) |
|
|
Brownfields; FEED & Project/Construction Management for an additional process line with support infrastructure; Process System expansion; 1. Process Line (Complete new) 2. Mill refurbishment 3. New Crusher circuit, new ore conveyors 4. Power distribution, Grid connection 5. Control & SCADA monitoring system Undertaken in-house with specialist process personnel nominated by Client joining the team project specific to complete the package. |
|
|
Finish
Jan 2014 - Dec 2014 |
3077 | Bakan Gold Project, Construction & Procurement Mgt (PCM) | - | North Sulawesi, Indonesia | PT J Resources Bolaang Mongondow / JResources Group (Indonesia) |
|
|
Resindo undertook the infrastructure & MHS engineering as separate Pkge. Subsequently awarded Project, Construction & Procurement Mgt using Client & Resindo systems for project delivery including process plant, crushing system with conveyors, power plant, balance of infrastructure; bulk fuel farm & auxiliaries, mining equipment workshops, bridges, mine office complex, permanent operations camp, water & waste water systems, related infrastructure. |
|
|
Finish
Jan 2013 - Dec 2013 |
3073 | Pani Gold Oxide Plant GFS (PFS) Extension Study | - | Sulawesi, Indonesia | JResources Group (Indonesia) (PSAB : IDX) |
|
|
Process & infrastructure update of previous Study undertaken; Plant capacity increase utilising client process model & additional Haul Roads, supporting infrastructure including bulk fuel facilities. Work includes design layouts of process plant, balance of infrastructure, finance modelling & Capex |
|
|
Finish
Jan 2013 - Dec 2013 |
3072 | Copper Plant Capex, Opex Study Update | - | Malaysia | RH Mining (Hong Kong) |
|
|
Update capital & operating estimates from previous third party study development |
|
|
Finish
Jan 2013 - Dec 2013 |
3030 | Wetar Copper BFS Update | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
All Process BoP infrastructure including expanded Mining Facilities, Warehousing, Haul Roads, River Crossing, Accommodation, Airstrip, support infrastructure, Jetty, Fuel Facilities, Project Schedule, etc. Work included SMP & Civil Works for Process Plant |
|
|
Finish
Jan 2012 - Dec 2012 |
3064 | North Lanut Gold Plant – Acid Mine Drainage Processing / Treatment Plant Engineering | - | North Sulawesi, Indonesia | JResources Group (Indonesia) (PSAB : IDX) |
|
|
Project was for the ongoing treatment of existing & future generated acid mine water from mining operations. Work included the design of the lime mixing system, pipeline transport of contaminated water, processing then pump to storage ponds for monitoring before release as per regulations. Scope included Capex & Opex development. |
|
|
Finish
Jan 2012 - Dec 2012 |
3005,3009 | Awak Mas Gold Development Study (& used for GFS) | - | Sulawesi, Indonesia | PT Masmindo Dwi Area – Pan Asia Resources (Aus) |
|
|
PFS for specific areas for gold processing plant & mine infrastructure. Being upgraded to full PFS and timing extended. Minproc undertook Process, Golder geotechnical and tailings, Resindo infrastructure including Capex and Opex. |
|
|
Finish
Jan 2012 - Dec 2012 |
3036 | Tujuh Bukit Gold Oxide Plant Infrastructure Pre-Feasibility Study | - | East Java, Indonesia | PT Indo Multi Niaga – Intrepid Mines Limited (Aus) |
|
|
PFS level engineering development with Capital estimates for supporting infrastructure: Mine infrastructure, Fuel system, Water & Waste Water Facilities, Roads. Power generation & distribution, coastal port facility, etc. AMEC Minproc undertook Process, Golder geotechnical and tailings, Resindo infrastructure, MHS including Capex & Opex. |
|
|
Finish
Jan 2012 - Dec 2012 |
3041 | Bakan Gold Project Design to Construction Level (IFC) | - | North Sulawesi, Indonesia | PT J Resources Bolaang Mongondow (Indonesia) (PSAB : IDX) (Previously Avocet - Britain) |
|
|
Greenfields; Crushing system including conveyors, powerplant, Balance of Infrastructure; Fuel farm & auxiliaries, process plant & mining equipment workshops, bridges, mine office complex, permanent operations camp, water & waste water systems, related infrastructure. |
|
|
Finish
Jan 2012 - Dec 2012 |
3073 | Pani Gold Project PFS (GFS – Government Feasibility Study) | - | Nth Sulawesi, Indonesia | PT J Resources Nusantara (Indonesia) (PSAB : IDX) (Previously Avocet - Britain |
|
|
Greenfields; Process provided by Client, process detail by Resindo, Resindo also develop the crushing system including conveyors, powerplant, Balance of Infrastructure; Fuel farm & auxiliaries, process plant & mining equipment workshops, bridges, mine office complex, permanent operations camp, water & waste water systems, etc. Resindo also developed the economic model with Client parameter inputs |
|
|
Finish
Jan 2012 - Dec 2012 |
3020 | Gold Project; Logistics Jetty, Office, Camp & Road Upgrades | - | East Java, Indonesia | PT Indo Multi Niaga – Intrepid Mines Limited (Aus |
|
|
Support services for developing coastal logistics jetty and upgrading on-shore infrastructure in preparation for gold plant works. Work includes engineering, tender development & review of local bidders to maximise local participation, site construction supervision for offices, core shed complex & preliminary infrastructure, capital estimate inputs for Coastal Port supporting KCA (USA). |
|
|
Finish
Jan 2011 - Dec 2011 |
3157 | BTR Wharf Jetty upgrade. | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Design & Construction Management of the jetty repair and upgrade joint with BTR Site Team |
|
|
Finish
Jan 2011 - Dec 2011 |
3006 | Heap Leach Stacker & Agglomerator Refurbishment Investigation | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Ltd |
|
|
Investigation for the Refurbishment / Repair of the Ex-Whim Creek Stacker & Agglomerator. Site investigation, part inspection, design and estimates |
|
|
Finish
Jan 2011 - Dec 2011 |
3030 | Copper Process Plant Expansion BFS Update | - | Wetar Is, Maluku, Indonesia | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Working with Finders and their consultants for the support & development of the Bankable Study Update. Resindo’s Workscope is sufficient design & costing to meet the study level requirement of: 1. Grasshopper conveyors and stacker for ore stacking for leach pads (With ACE). 2. Additional crusher circuits for Stage 1 & Stage 2 process plants. 3. Structural, Mechanical & Piping Pkge & Fabrication Support for tender process, technical aspects and coordination. Support for Bankable Feasibility Study updates; power, MHS, bridge/causeway, fuel, etc. civil estimating for other consultants, Whim Creek refurbishment, tanks, equipment, materials supply, etc. |
|
|
Finish
Jan 2013 - Dec 2013 |
3030 | Wetar Copper Project – MFO Power Plant DFS | - | Wetar Is, Maluku, Indonesia | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Power plant formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2013 - Dec 2013 |
6017 | Gas Power Plant Construction Supervision | - | South Sumatra, Indonesia | MeppoGen (Indonesia) |
|
|
Supervision support for combined cycle upgrade to GE LM6000 (x2) turbine power plant. |
|
|
Finish
Jan 2013 - Dec 2013 |
3058 | Nickel Process Plant & Infrastructure – Coal Fired Power Plant GFS (PFS) | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Power plant formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2012 - Dec 2012 |
3066 | Nickel Plan Development – Coal Fired Power Plant GFS (PFS) | - | Southern Sulawesi | PT. Ceria Nugraha Indotama (CNI) (Indonesia) |
|
|
Power plant formed part of overall scope. Refer complete project description: |
|
|
Finish
Jan 2011 - Dec 2012 |
5003 | Wetar Copper Project - Power Generation Options Study | - | Wetar Is, Maluku, Indonesia | PT Batutua Tembaga Raya (BTR) / Finders Resources Limited (Aus) (ASX: FND) |
|
|
Study to determine preferred power plant configuration and trade-offs for a 20MVA generating plant, distribution system, tank farm and supporting infrastructure |
|
|
Finish
Jan 2011 - Dec 2011 |
3045 | Morowali Nickel Heap Leach Process Plant – Coal Fired Power Plant Scoping Study | - | Sulawesi, Indonesia | Bumanik (Indonesia) (PSAB : IDX) - Ausenco Vector (Aus) |
|
|
Power plant formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2011 - Dec 2011 |
3011 | Gag Island Nickel Process Plant & Supporting Infrastructure Study – Coal Fired Power plant | - | Gag Island, Maluku, Indonesia | Antam (Indonesia) Ausenco Vector (Aus) |
|
|
Power plant formed part of overall scope. Refer complete project description: |
|
|
Finish
Jan 2011 - Dec 2011 |
3025 | Dampala Nickel Plant -CFPP Power Plant Scoping Study. | - | Sulawesi, Indonesia | TransAsia (Indonesia) – Ausenco Vector (Aus) |
|
|
Power plant formed part of overall scope. Refer complete project description: |
|
|
Finish
Jan 2024 - Jan 2024 |
- | Various | - | Various | Various |
|
|
Resindo undertakes road and bridge design and implementation coordination as an integral part of many of our projects in addition to stand alone road projects. Our experienced staff using modern software tools design fit for purpose Haul Roads, Toll Roads, Access Roads and bridges for all industry sectors. Details can be found throughout our reference projects listed. |
|
|
Finish
Jan 2015 - Dec 2016 |
5012 | SAPT 20MW HSD Power Plant - Fuel Farm | - | Karachi, Pakistan | HPH, Hutchison Port Holdings (Hutchison Whampoa Group) (HK) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2012 - Dec 2013 |
1054 | Palaran River Coal Terminal Study | - | East Kalimantan, Indonesia | Mesra Group |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2012 - Dec 2013 |
3058 | Nickel Process Plant & Infrastructure GFS – Bulk Fuel Farm | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description: |
|
|
Finish
Jan 2011 - Dec 2012 |
3066 | Nickel Plan Development | - | Southern Sulawesi | PT. Ceria Nugraha Indotama (CNI) (Indonesia) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2011 - Dec 2012 |
3055 | Copper Process Plant Expansion BFS Update | - | Wetar Is, Maluku, Indonesia | Finders Resources Limited (Aus) (ASX: FND) |
|
|
Bulk Fuel storage formed part of overall scope. Refer complete project description |
|
|
Finish
Jan 2020 - Dec 2020 |
- | Aqua Culture Access Road & Jetty Development Study | - | Lake Toba North Sumatra Indonesia | PT. Regal Springs Indonesia |
|
|
| Development and review of new road options to relocate the onshore operations and provide a new Jetty for current operations and future expansion. Work includes development options, routes and capital costs. |
|
|
Finish
Jan 2016 - Dec 2016 |
6049 | Road & Bridge Study | - | Myanmar | PUMA Energy (Myanmar) / SMEC |
|
|
Working jointly together, SMEC-Resindo undertook the road & bridge options review, structural & civil analysis and preliminary design. Work also included Capex development. |
|
|
Finish
Jan 2016 - Dec 2016 |
6035 | Ciawi-Cigombong/Lido Toll Road & Bridges Detailed Design – Work Pkges 2&3 | - | East Java, Indonesia | POSCO E&C Indonesia (Korea) for Trans Jabar Tol |
|
|
Detail design for the new Toll Road with multiple bridges to fit the actual topography for construction ( |
|
|
Finish
Jan 2023 - Dec 2023 |
6070 | Chemical Mixing Plant Balance of Plant (BoP) EPC. | - | North Jakarta, Indonesia | PT. Cuprum Industries Indonesia |
|
|
Design, Supply and Install Balance of Plant for a Chinese Chemical Mixing Plant. Fit out warehouse - Upgraded electrical supply, electrical panels, cabling & grounding. - Genset with C/O - Utility Piping, Exhaust Ducting for Industrial Mixers Containerised Office / Accommodation installation Industrial |
|
|
Finish
Jan 2015 - Dec 2023 |
6040 | Fabrication & Casting Inspection – Process Plant Major Equipment | - | Jakarta, Medan, Indonesia Bangkok, Thailand | Metso:Outotec Australia |
|
|
Inspections on behalf of and with Outotec for compliance of fabrication and castings for their major equipment supply to projects in the region. |
|
|
Finish
Jan 2021 - Dec 2021 |
6069 | Tarac Distillery; Fire System Upgrade – Civil & Electrical Detail Design | - | South Australia | Emanden Pty. Ltd. (Australia) |
|
|
Resindo was engaged to undertake the Detail Design for the major Distillery’s fire system upgrade. Work included earthworks, hydrocarbon tank rupture direction channels, bunding and related civil works, electrical earthing works. |
|
|
Finish
Jan 2021 - Dec 2021 |
6069 | Tarac Distillery; Fire System Upgrade – Civil & Electrical Detail Design | - | South Australia | Emanden Pty. Ltd. (Australia) |
|
|
Resindo was engaged to undertake the Detail Design for the major Distillery’s fire system upgrade. Work included earthworks, hydrocarbon tank rupture direction channels, bunding and related civil works, electrical earthing works. |
|
|
Finish
Jan 2021 - Dec 2021 |
6068 | Tarac Distillery; Fire System Upgrade – Civil Basic Design | - | South Australia | Emanden Pty. Ltd. (Australia) |
|
|
Resindo was engaged to undertake the Basic Design for the major Distillery’s fire system upgrade. Work included earthworks, hydrocarbon tank rupture direction channels, bunding and related civil works. |
|
|
Finish
Jan 2021 - Dec 2021 |
3194 | Chromite BoP Design Scoping / PFS | - | Papua New Guinea | PT Solway Group Indonesia / Russia / Geneva |
|
|
Resindo was engaged to undertake the Balance of Plant Design to provide a basis for PNG Contractors to quote for the construction works, which would then go to board for decision. Work included placement of the modular process plant (by 3rd Party), Mining Support facilities, Camp, Jetty for Barge Berth, power generation & distribution (gensets), Camp, Water Supply including water intake, cross country pipeline and distribution, Roads and earthworks, main equipment capital costs for reference with Contractor submission, etc. |
|
|
Finish
Jan 2020 - Dec 2020 |
8007 | Process & Power Plant - Spare Parts, Materials & Services | - | Various Indonesia | PT. Elnusa |
|
|
Supply of mechanical equipment, spare parts, materials and mobile plant services as required across operations. |
|
|
Finish
Jan 2020 - Dec 2020 |
- | Wetar Copper Project | - | Wetar Island Indonesia | PT Batutua Tembaga Raya (Finders ASX) |
|
|
Supply of spare parts for aged crushing system repairs / maintenance as required. |
|
|
Finish
Jan 2016 - Dec 2016 |
6046 | Thermal Desorption Unit (TDU) Process Plant – Detailed Tender Engineering | - | Sumatra, Indonesia | Chevron Indonesia |
|
|
Working jointly together, RLC – SMEC - Resindo undertook the full tender design; Civil, Structural, Mechanical, Electrical & Process for the TDU process plant treating oil contaminated soil. Work included full Capex & Opex development for a BOOT. |
|
|
Finish
Jan 2012 - Dec 2012 |
1040 | BHPB Semi-Permanent Barge Berth Civil Design | - | Central Kalimantan Indonesia | Thiess Indonesia/ BHPB Indonesia |
|
|
Design of semi-permanent barge and LCT berthing structures for construction equipment access, bulk materials and other uses as required for the Port development. Soft ground conditions warranted option review and selection for technical fit and construction safety. |
|
|
Finish
Jan 2012 - Dec 2012 |
3064 | Lime Mixing & Dosing System EPCM | - | Northern Sulawesi Indonesia | PT J Resources Bolaang Mongondow (PSAB : IDX) (Previously Avocet - Britain) |
|
|
EPCM for small lime milling, mixing and dosing system to assist and augment the current manual operations for Acid Mine Drainage (AMD) mitigation. Work includes the design, equipment sourcing and management of site construction with Client Team. |
|
|
Finish
Jan 2011 - Dec 2011 |
6006 | MHS Steel Fabrication Management | - | Surabaya, Indonesia for Western Australia | Australian Conveyor Engineering (ACE) |
|
|
Steel fabrication management for West Australian project; conveyors, platforms, etc. work includes welding inspection & QA monitoring, schedule review, status reporting. |
|
|
Finish
Jan 2011 - Dec 2011 |
3021 | Portable Magnetite Process Plant | - | Papua, Indonesia | Como Engineers (Aus)/ GeoServices |
|
|
Detail engineering/design of skid mounted magnetite processing module. FEED by Como Engineers (Aus/Indo) for use by Geoservices at Freeport, Papua. |
|
|
Finish
Jan 2010 - Dec 2010 |
6004 | Jetty Remediation & Expansion – Ocean Vessels | - | Balikpapan, East Kalimantan, Indonesia | PT Petrosea Tbk - Indika Group (Indonesia) |
|
|
Review for jetty remediation & expansion to accommodate additional deep draft ocean vessels. Suspended slab construction. Initial design and capital cost development. |
|
|
Finish
Jan 2010 - Dec 2010 |
1003/1006 | Minerals Development Consultancy | - | Indonesia | DHV Indonesia |
|
|
Consultancy to support DHV in the development of capability in the minerals sector. DHV are a leading consultant in water & wastewater systems. |
|
|
Finish
Jan 2024 - Dec 2024 |
1121 | Major Coal Office Complex Buildings (x8) HVAC Detail Design (IFC) | - | Tanjung, South Kalimantan, Indonesia | PT Adaro Indonesia |
|
|
Design development of the HVAC System for the Coal Mining Office KM73 Complex Buildings. 1) Detail Design for eight (8) Buildings including: a) Site Investigation current Building conditions b) Technical Specifications. c) HVAC calculations. d) Drawings for the installation works for the various buildings. Capital Cost Estimate including unit price analysis, work volume calculations, unit prices for materials and equipment. |
|
|
Finish
Jan 2023 - Jul 2023 |
3210 | Adaro Coal: Investigation & Rectification Design of Major Coal conveyor | - | Central Kalimantan, Indonesia | PT SSI |
|
|
Supporting the Head Contractor PT SSI, Resindo undertook the investigation and rectification design of the civil, structural and mechanical degradation of the existing major coal conveying system. Work includes evaluation of structural loads, foundations / civil, corrosion, alignment etc. with design for rectification. Work includes the provision of Site Engineers to support the construction works by the Head Contractor. |
|
|
Finish
Jan 2022 - Mar 2022 |
1118 | Coal Conveyor Loading, Reclaim, Structural & Mechanical Analysis with Rectification Design Recommendations. | - | Central Kalimantan, Indonesia | Golder Indonesia |
|
|
Supporting Golder Indonesia for technical review/assessment of contractor calculations for Barge Loading Conveyor, Radial Stacker, Reclaim Stockpile Tunnel and Jetty. Work includes evaluation of structural loads, foundations / civil including jetty bridge access, mechanical loads, together with developing strengthening drawings to support Contractor improvement works. Site is held confidential. |
|
|
Finish
Jan 2021 - Dec 2021 |
1117 | Coal Plant Deformation Rectification - Construction Mgt of EPC Contractor | - | Central Kalimantan, Indonesia | PT SMM |
|
|
Resindo is engaged for Construction Mgt of the EPC Contractor (Western / Chinese) to rectify structural & mechanical deformation issues in the coal Wash Plant they commissioned previously. Site team consists of Structural and Mechanical Engineers with design review of Contractor rectification designs and methodologies by our Jakarta Engineering, Construction & Scheduling Team. |
|
|
Finish
Jan 2021 - Dec 2021 |
1117 | Coal Plant Deformation Analysis with Rectification Design Recommendations. | - | Central Kalimantan, Indonesia | Golder Indonesia |
|
|
Supporting Golder Indonesia for the structural analysis, calculation and rectification methods for a BC coal handling site which has undergone deformation due to ground movement, support Client in discussion with Contractor for rectification. |
|
|
Finish
Jan 2021 - Dec 2021 |
1116 | Coal Stockpile Retaining Wall Deformation Analysis with Rectification Design Recommendations. | - | Central Kalimantan, Indonesia | Golder Indonesia |
|
|
Supporting Golder Indonesia for the structural analysis, calculation and rectification methods for a BC coal stockpile retaining wall which has undergone deformation due to ground movement, support Client in discussions for rectification. |
|
|
Finish
Jan 2021 - Dec 2021 |
2119 | Coal Process Plant / Washplant Technical Review | - | Central Kalimantan | Confidential |
|
|
Resindo was engaged to undertake a detailed technical review of a newly built (Western) 500tph Metallurgical Coal Washplant and determine why capacity throughout is not being met. Work includes technical review including design basis, construction review of plant to identify issues and an operations review of the system with recommendations to bring the plant to full capacity. Resindo has engaged an expert Coal Process Engineer from Australia to assist with the process review. ( |
|
|
Finish
Jan 2019 - Dec 2020 |
1104, 1105 & 1113 | Adaro CHPP Construction Management Fabrication Management / Inspection. Coal Process Plant (CHPP) Materials Handling Systems Bulk Fuel Tanks | - | Central Kalimantan, Indonesia | PT. Bukit Makmur Mandiri Utama (BUMA) |
|
|
Resindo has provided Project / Construction Management Teams including field design staff to the project site for the site construction works. Work involves utilisation of both Client and Resindo systems. Teams currently deployed; Central Kalimantan - Structural Mechanical Piping Construction Management to BUMA for Adaro (Maruwai) CHPP. In addition Resindo provide subcontract SMP trades personnel, tools and equipment to support our Client at site. Bulk Fuel Tanks. Resindo provided fabrication inspection and site construction management personnel for the three (3) x Bullet Fuel Tanks and the two (2) x 1.5 million litre bulk fuel tanks. Resindo has provided Project / Construction Management Teams including field design staff to the project site for the site construction works. Work involves utilisation of both Client and Resindo systems. Teams currently deployed; Central Kalimantan - Structural Mechanical Piping Construction Management to BUMA for Adaro (Maruwai) CHPP. In addition Resindo provide subcontract SMP trades personnel, tools and equipment to support our Client at site. Bulk Fuel Tanks. Resindo provided fabrication inspection and site construction management personnel for the three (3) x Bullet Fuel Tanks and the two (2) x 1.5 million litre bulk fuel tanks. |
|
|
Finish
Jan 2019 - Dec 2019 |
1111 | Haul Road Design | - | East Kalimantan | PT IndoBara Pratama (IBP) |
|
|
Resindo is engaged to undertake the construction level design for the new Haul Road based on high capacity trucks 2x100t. Work extended to include hydrology and geotechnical works for the Haul Road and Port Areas |
|
|
Finish
Jan 2019 - Dec 2019 |
1099 & 1100 | Construction Management Fabrication Management / Inspection. Materials Handling Systems Camps | - | East & South Kalimantan, Indonesia | PT. Bukit Makmur Mandiri Utama (BUMA) |
|
|
Resindo has provided several Project / Construction Management Teams including field design staff to each project site for the site construction works. Work involves utilisation of both Client and Resindo systems. Teams at different sites were deployed to; 1. South Kalimantan – Adaro MHS systems Wara. Site Construction Mgt and Fabrication Mgt. 2. East Kalimantan – Greenfield Camp Construction Mgt. 3. East Kalimantan – Berau Camp Expansion Construction Mgt. 4. Central Kalimantan – Adaro Haul Road Construction Mgt. Central Kalimantan - Construction & Fabrication Management of Adaro fuel tanks; two (2) x 1.5 million litre capacity, three (3) x 39kL capacity |
|
|
Finish
Jan 2018 - Dec 2018 |
3165 | Coal Port Restart Review Existing Plant Capacity Evaluation | - | Central Kalimantan, Indonesia | PT BKP / Harum Energy |
|
|
Resindo was engaged to review the current condition of the existing dormant Coal Barge Port equipment and systems for potential restart, then econdly moderate upgrade options to the existing equipment to increase throughput |
|
|
Finish
Jan 2018 - Dec 2018 |
- | Coal Haulage Bridge Structural Assessment | - | East Kalimantan Indonesia | PT BIS Industries (Indonesia / Australia) |
|
|
Structural analysis for existing concrete steel haulage bridge across river to ensure adequacy for new 320t capacity coal haulage truck and trailer units |
|
|
Finish
Jan 2018 - Dec 2018 |
- | Coal Haulage Bridge Structural Assessment | - | East Kalimantan Indonesia | PTS Madhani Talatah Nusantara |
|
|
Structural analysis for existing concrete steel haulage bridge across river to ensure adequacy for increased production requirements based on coal haulage truck and trailer units |
|
|
Finish
Jan 2018 - Dec 2018 |
1095 | Coal Mine Technical Due Diligence | - | East & Central Kalimantan Indonesia | VMI (USA) |
|
|
Supporting US Group to review investment options for coal mines through Technical Due Diligence. Work includes condition assessment of existing crushers, conveyors, stockpile stacking systems, barge loadout systems, Haul Roads, then upgrade options and Capex for capacity and reliability |
|
|
Finish
Jan 2015 - Dec 2015 |
1065 | Coking Coal Mine Engineering, Project Mgt & Implementation (EPCM) | - | Central Kalimantan Indonesia | Cokal Coal (ASX Listed) |
|
|
Design to construction level with Capital (Capex) & Operating (Opex) estimates, Procurement & Construction Management; Mine area crushing system, workshops, camp, supporting infrastructure, 62km Haul Road with two major bridges, two River Ports with stacking, reclaim, and loadout - bargeloading systems, one ISP load in system with grab crane, conveyors & stockpiles and bulk fuel storage facilities. Post DFS work extended to FEED in preparation for detailed engineering |
|
|
Finish
Jan 2018 - Dec 2018 |
1089 | Haul Road & Bridges Basic Design (FEED) | - | Central Kalimantan Indonesia | PT Borneo Prima - IMR |
|
|
Undertaking basic design for 103 km Haul Road upgrades from existing logging roads for initial low volume start-up of coking coal mine. |
|
|
Finish
Jan 2017 - Dec 2017 |
- | Coal Barge Port, MHS & Stockpile - Engineering | - | Samarinda East Kalimantan Indonesia | PT. BSSR Baramulti Group |
|
|
Coal Port engineering for Study & implementation phase use by EPC contractor. Work includes design of the complete port; barge loading conveyor, automated stacking, reclaiming, overland conveyors, power generation, fuel storage & support facilities. |
|
|
Finish
Jan 2017 - Dec 2017 |
2018 | Coal Processing & Handling Project (CHPP) - Technical Support / Review | - | Africa | Large International Investor / Operator Confidential |
|
|
Resindo is engaged to provide technical review and related EPC-commercial support for the Client / Owner in development of the EPC contract |
|
|
Finish
Jan 2023 - Dec 2023 |
2016 | BHPB Coal Processing & Handling Project (CHPP) – Basic Engineering for the Definitive Feasibility Study (DFS) and the -Engineering, Procurement & Construction (EPC) Contract | - | Central Kalimantan Indonesia | Phase 1 Basic Engineering -Complete. Phase 2 Implementation Halted. BHPB left Indonesia |
|
|
Resindo working in Joint Venture with an offshore coal process plant designer. Work included the design, procurement and construction of BHPB’s first major Coal project in Indonesia. OS Process design and Resindo work as an integrated Team with OS undertaking the Front End Process Design for the coking coal plant, Resindo the front end & detailed design for MHS / conveyors and balance of plant. Work scope includes the CHPP Definitive Feasibility Study for integration into BHPB’s larger Study and the EPC Contract for the CHPP project delivery. |
|
|
Finish
Jan 2016 - Dec 2016 |
1090 | Coal Haul Road & Port Upgrade Engineering & Support for Implementation | - | South Sumatra Indonesia | Pinang Coal (Noble Group) |
|
|
Resindo is undertaking the Haul Road design, earthworks modelling and optimisation for both existing and new sections of the 140km Haul Road. Work includes several public & dedicated bridges and new pipeline crossings. Resindo will also undertake the preliminary infrastructure expansion review at Port and Mine together with upgrade and repair engineering for the existing Port MHS system. All work includes Capex development |
|
|
Finish
Jan 2016 - Dec 2016 |
1086 | Coal Transport Infrastructure Study | - | East Kalimantan Indonesia | Equis Group |
|
|
Work covers the overland conveyor systems from the Mine to the Port, then various options for partial conveying & trucking to optimise Capex versus Opex trade-offs. Work included the preliminary design of OLC, Port & ISP crushing, stacking & reclaiming systems, Port Bargeloading conveyor and barge berthing jetty. Capital & operating Costs. |
|
|
Finish
Jan 2015 - Dec 2015 |
1071 | Definitive Feasibility Study (DFS) BP Coal Mine Development Infrastructure; Mine & Port | - | Central Kalimantan Indonesia | PT Borneo Prima / IMR |
|
|
Work covers the Mine and Port area development including Crushing, Stacking, Loadout, Power and all Support Facilities including bulk fuel facilities for staged production from 600ktpa (Year 1) to 2-3mtpa Year 4). Haul Road is excluded and is currently under construction. Capex, Opex and Report to be developed for our section of the work as summarised. Reserves consultant is overall FS Coordinator and compiling the final integrated report including undertaking the Resource/Reserve works, financial model, etc. A Washplant forms part of the project and will be undertaken by a specialist consultant in Australia. ( |
|
|
Finish
Jan 2014 - Dec 2014 |
1063 | BAR Coal Port Development PFS | - | East Kalimantan, Indonesia | PT. Bumi Alam Raya (BAR) |
|
|
Awarded the Pre- Feasibility Study of Port Stockpile & Bargeloading Infrastructure with the following activities: 1. Port Infrastructure including stockpiles, reclaim conveyors, bargeloading, bulk fuel facilities. Coal Haul Road |
|
|
Finish
Jan 2014 - Dec 2014 |
1065 | Coking Coal Mine Bankable Feasibility Study (BFS) Coordination & Engineering | - | Central Kalimantan Indonesia | Cokal Coal (ASX Listed) |
|
|
Awarded the coordination of the BFS from the respective 3rd party consultant & contractor inputs for coking coal mine development; pit to port & export inclusive all coal handling & infrastructure including bulk fuel farm. Work includes capital & operational estimates, report development, balance MHS engineering, etc. Secondly awarded the engineering for two bridges with approaches for the haul road including coordination of geotechnical investigation |
|
|
Finish
Jan 2014 - Dec 2014 |
1064 | Solway Coal Development; Haul Road & Bridges Review | - | Central Kalimantan, Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Awarded the estimate includes MTO’s, basis, Engineering layouts. Haul road Mine are up to existing road is approximately 5 Km length, Bridges, Office, Warehouse & workshop, Camp Facility, Utility (incl. fuel supply, water supply and fire fighting) & communication , Power generation, Laydown Area, earthwork for each area . |
|
|
Finish
Jan 2013 - Dec 2013 |
1055 | Coal Mine Technical Due Diligence | - | East Kalimantan Indonesia | KOWEPO (Korean Government Company) |
|
|
Resindo working with Deloitte Indonesia Resindo Scope: Review of existing Coal Mine approx 6mtpa; infrastructure, coal processing including crushing, stacking, loadout, transport; mine and river port; condition and capacity including capital asset/cost review for potential investor/acquisition. |
|
|
Finish
Jan 2013 - Dec 2013 |
1054 | Palaran River Coal Terminal Study | - | East Kalimantan, Indonesia | Mesra Group |
|
|
Develop options for three separate product lines with crushing, stockyards, reclaim and bargeloaders with supporting infrastructure for development of River Coal Port. Workscope included local generation and river port fuel farm. Tradeoffs for Capex, Opex and staged construction with respect to export volumes and planned life of facility |
|
|
Finish
Jan 2018 - Dec 2018 |
3152 | Weda Bay Nickel Haul Roads & Bridges Basic Design for Construction | - | Halmahera Indonesia | Eramet (France) / Tsingshan Group (China) |
|
|
Resindo working under a Ming & Resource Consultant Resindo was engaged to undertake the construction level design for three elements; Upgrade existing haul roads, Design new haul roads (total 35 km) and Design a range of bridges for haulage. Work includes full hydrology development / update and geotechnical review being undertaken by PT GRM to support the works |
|
|
Finish
Jan 2013 - Dec 2013 |
1053 | BHPB Coal Yard MHS & Camp Infrastructure Verification Engineering | - | Central Kalimantan, Indonesia | Thiess Indonesia |
|
|
Construction level design review & verification of Subcontractor MHS design functionality & Client camp design compatibility to BHPB design criteria & requirements. Extended to detail design of selected facilities supporting Thiess Indonesia for this project. |
|
|
Finish
Jan 2013 - Dec 2013 |
1045 | Coal Port Technical Due Diligence – 6mtpa | - | South Sumatra, Indonesia | SK Networks (Korea) |
|
|
Review of current construction level & development plan for river coal port; engineering, complete gaps as required with prelim engineering as necessary for 6mtpa coal river port proposed development. Develop comparative capital & operational cost estimates to assist decision processes. |
|
|
Finish
Jan 2012 - Dec 2012 |
1042 | Coal Technical Due Diligence incl. Preliminary Design Options 1mtpa, 5mtpa | - | East Kalimantan, Indonesia | Solway Group (Russia) |
|
|
Review of IUP coal development plan, engineering, complete gaps for concept design for initial production leading to stage 2 5mtpa facilities. Mine, Haul Road, Port. Capital & Operating estimates to assist client progress development options. Railway review options. |
|
|
Finish
Jan 2012 - Dec 2012 |
1041 | Coal Technical Due Diligence – Coal 15mtpa Infrastructure & Transport | - | South Sumatra, Indonesia | Peabody Energy (USA) |
|
|
Review of engineering, complete gaps as required with preliminary engineering and capital estimates for 15mtpa coal mine, haul road and transport infrastructure. Develop comparative capital & operational cost estimates for these areas. |
|
|
Finish
Jan 2012 - Dec 2012 |
1031 | Malinau Master Plan Development; Operating Coal Mine Expansion | - | East Kalimantan | PT. Baradinamika Mudasukses (Baramulti Group) (Indonesia) |
|
|
Review of current coal operation & development/expansion plans for an operating mine. Determine & develop preferred staged expansion solutions to meet target production & form a Master Plan moving forward. Workscope includes Mine Operations Area (Stockyards, loadout bargeloading conveyors & support infrastructure), haul road upgrades with new sections, port stockyard, loadout with infrastructure. |
|
|
Finish
Jan 2012 - Dec 2012 |
1039 | Coal Port & Haul Road Technical Due Diligence | - | Sumatra | MTD Group - Malaysia (Owners of CIBT Terminal Java) |
|
|
Review & report on operating Coal Mine’s design, Capex and Opex for Coal Jetty development including stock yards, bargeloading conveyors & new access Haul Road. |
|
|
Finish
Jan 2011 - Dec 2011 |
1032 | Coal Port Location, Infrastructure & Capacity Scoping Study | - | East Kalimantan, Indonesia | Param Mitra Resources Pte. Ltd./ Daun Resources (India/ Netherlands) |
|
|
Investigate options for new coal river port location based on access & river availability, trans-shipment options along river. Determine capacity of existing port in area and expansion options. Determine haul road routes from mine, access requirements, coal handling capacity at port, bargeloading solutions, general support infrastructure including river port fuel farm. Develop high level corresponding Capex & Opex estimates. Work involves site investigation and review with local government, communities, operators, other mines in the area together with desktop work. |
|
|
Finish
Jan 2011 - Dec 2011 |
1027 | Coal Mine Master Development Plan, Basic & Detail Engineering | - | East Kalimantan, Indonesia | PT Antang Gunung Meratus - Baramulti Group (Indonesia) |
|
|
Develop Master plan for staged development increases of 4 sites including 2 ports (river & canal) for staged production increases from 1mtpa to 15mtpa. Scope of work includes crushing circuits for mine area, stockyards with stacking and loadout systems for three areas, bargeloading conveyors for two areas/ports, marine berths for loading and unloading, power generation, workshops, bulk fuel and support facilities. Development of detailed engineering deliverables for EPC tender process. |
|
|
Finish
Jan 2011 - Dec 2011 |
1001 | Coal Chain Brownfield’s Expansion, new Greenfields; Technical, Capex & Opex Review | - | South Sumatra, Indonesia | U-Resources/ Standard Chartered/ ANZ |
|
|
Review of existing operations & expansion works for operating coal chain, mine, haul road, river port - truck on barge moving to bargeloader with stacking reclaim system, also second greenfields mine site with long haul road for future expansion to tie into developing infrastructure; technical/capacity, risks, Capex and Opex. |
|
|
Finish
Jan 2010 - Dec 2010 |
1012 | RJM Coal Mine Development Support - Stage 1 | - | South Sumatra, Indonesia | Bumi Semesta Lestari - Panin Bank Group (Indonesia) |
|
|
Coal mine development Study and subsequent tender management for Stage 1 coal Mine Development for 600ktpa production. Scope included haul road, mine and river port infrastructure, capital & operating cost development. Tender generation and contractor negotiation on behalf of Client. |
|
|
Finish
Jan 2010 - Dec 2010 |
1012 | MAR Coal Mine Development Support - Stage 1 | - | MAR Coal Mine Development Support - Stage 1 | Bumi Semesta Lestari - Panin Bank Group (Indonesia) |
|
|
Coal mine development Study and subsequent tender management for Stage 1 coal Mine Development for 600ktpa production. Scope included haul road, mine and river port infrastructure, capital & operating cost development. |
|
|
Finish
Jan 2010 - Dec 2010 |
1055 | Coal Mine Technical Due Diligence | - | South Kalimantan, Indonesia | Standard Bank (Singapore) |
|
|
Review of existing and planned infrastructure, processing, transport, port and off-site infrastructure, planned capital cost review. |
|
|
Finish
Jan 2010 - Dec 2010 |
1003 | KCP Major Coal Development - Review Study | - | East Kalimantan, Indonesia | ICD/Churchill (Aus) |
|
|
Resindo working with Hatch Australia for the formal technical review of the Coal development project including Overland Conveyor, Coal Stockyards, coastal Port infrastructure including shiploaders for major coal port. Review included Capex and Opex evaluations. |
|
|
Finish
Jan 2010 - Dec 2010 |
1007 | Zeus MIP Coal Technical Due Diligence | - | South Sumatra, Indonesia | Deloitte Bank |
|
|
Study of existing and planned infrastructure, processing, transport, port and off-site infrastructure, capital cost review, economic model inputs with risk & opportunities analysis. |
|
|
Finish
Jan 2010 - Dec 2010 |
1008 | Hera MME Coal Technical Due Diligence | - | South Sumatra, Indonesia | Deloitte Bank |
|
|
Study of existing and planned infrastructure, processing, transport, port and off-site infrastructure, capital cost review, economic model inputs with risk & opportunities analysis. |
|
|
Finish
Jan 2010 - Dec 2010 |
6002 | MEC Coal Rail Project - Consultancy Service | - | East Kalimantan, Indonesia | Laing O'Rourke (Aus) |
|
|
Consultancy work for MEC Coal Rail project tender providing constructability methodology and capital estimate inputs. |
|
|
Finish
Jan 2010 - Dec 2010 |
1010 | Coal Mine Development Consultancy | - | Central Kalimantan, Indonesia | Kekal Adidaya (Indonesia) |
|
|
Consultancy support for preparation of coal mine development. |
|
|
Finish
Jan 2017 - Dec 2017 |
3079-23 | Nickel Smelter Upgrades – HMI Automation Engineer Secondment | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Resindo has provided a Human Machine Interface (HMI/MMI) automation design engineer to form part of the PTVI team upgrade works at site. |
|
|
Finish
Jan 2017 - Dec 2017 |
3079_20 | Nickel Smelter Upgrades – Melt Deck Floor Lowering | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Work includes structural review, analysis and engineering for the lowering of the melt deck floor and associated engineering works. |
|
|
Finish
Jan 2017 - Dec 2017 |
3079_19 | Nickel Smelter Upgrades – Dos#2 Kiln Shuttle Conveyor Upgrade | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Structural review, analysis and engineering for the DOS#2 Kiln Feed Building for the Shuttle Conveyor & its associated auxiliaries |
|
|
Finish
Jan 2017 - Dec 2017 |
3079_11 | Structural review, analysis and engineering for the DOS#2 Kiln Feed Building for the Shuttle Conveyor & its associated auxiliaries | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Resindo is engaged for the engineering work for the main fire/process water pipeline replacement. Objectives are to provide new system facilities that are reliable for adequate flow and pressure (raw, process & fire water) for the existing Vale process plant and to accommodate the requirement for the future Major Expansion Project (MEP 1 & 2) including the Fuel Tank Farm area. Work also includes a new water reservoir and geotechnical investigation to support design. |
|
|
Finish
Jan 2016 - Dec 2016 |
3127 | Nickel Atmospheric Leach Process Plant – Process Support & Balance of Plant Scoping Study. | - | Sulawesi, Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Resindo is engaged to follow on from the Process PFD, Mass Balance & key equipment sizing to develop a Scoping Study. Resindo’s scope includes: Preliminary Process Plant layout, MHS & stockpiles, infrastructure design - barge port, access roads, electrical load lists for process and all areas, Grid Power line with substation, distribution, workshops, etc. Capex for Process Plant and all facilities. Opex for infrastructure/support services and reagents, etc for separate Process Plant Opex |
|
|
Finish
Jan 2016 - Dec 2016 |
- | Nickel Process Plant & Infrastructure including Coal Fired Power Plant - DFS | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Geneva/Russia) |
|
|
Leading Chinese Process Group is undertaking the Process Plant design; RKEF & Smelter with Western inputs. Resindo is supporting for process plant civil and structural design, supporting infrastructure and structures within the process plant, total plant construction installation estimates, in-country logistics for construction & operations including coal for reductants & power plant. |
|
|
Finish
Jan 2015 - Dec 2015 |
3101 | Nickel Smelter Project; Process Screening & Conceptual Studies (FEL1) | - | Halmahera & West Java Indonesia | Posco |
|
|
Process Screening Study & FEL1 Process Study Process evaluation of different technologies and sources as an initial screening study followed by FEL1 Study for selected options. Process Criteria, technologies, layouts, capital and operating estimates will be developed to support Client decision making processes. |
|
|
Finish
Jan 2015 - Dec 2015 |
3100 | Nickel Smelter Project; Process Plant Sites, Infrastructure Development PFS | - | Halmahera & West Java Indonesia | Posco |
|
|
Pre-Feasibility Study (PFS) for nickel smelter infrastructure for three sites in Halmahera & West Java. Workscope includes all aspects of balance of plant, infrastructure, power generation and grid options, layouts, site selection and comparison, transport logistics & options for reagents, coal and nickel ore; truck, barge, vessel, comparative analysis Indonesia-Australia, capital & operating cost estimates supporting the main process section |
|
|
Finish
Jan 2015 - Dec 2015 |
3079-4 | Nickel Process Plant - Engineering Services Contract Pkge #5 HSFO Main Tank, Pumps & Automation | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Inco Nickel Plant; On-Call Engineering services contract for two (2) years 2013 & 2014 (extended to mid 2015 by Vale) covering all disciplines for new and upgrade works across the Nickel plant facilities. Work includes engineering and site supervision. Pkge: HSFO Main Tank Automation (System Upgrade). Including demolition, design, construction mgt and commissioning; building structure modifications, new platforms, new piping system, new pumps, new & upgraded MCC’s, PLC and SCADA automation |
|
|
Finish
Jan 2014 - Dec 2014 |
3079-1 | Nickel Process Plant - Engineering Services Contract Pkge #1 Molten Sulphur Line | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Inco Nickel Plant; On-Call Engineering services contract for two (2) years 2013 & 2014 covering all disciplines for new and upgrade works across the Nickel plant facilities. Work includes engineering and site supervision. Current Pkge: Molten sulphur line duplication and upgrade; pipelines, pipe bridges, heat tracing system, Genset backup system, PLC Control system modification & expansion, commissioning. |
|
|
Finish
Dec 2013 - Dec 2014 |
3079-5 | Nickel Process Plant – WOS (Wet Ore Stockpile) Engineering & Geotechnical Design | - | Sorowako, Sulawesi, Indonesia | PT. Vale Indonesia (Inco) |
|
|
Engineering design including geotechnical investigation for the new Wet Ore Stockpile development. Geotechnical work being undertaken by Golder Associates (Indonesia) as subcontract and providing the inputs for the design process. |
|
|
Finish
Jan 2012 - Dec 2013 |
3058 | Nickel Process Plant & Infrastructure - GFS | - | Sulawesi Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Leading Chinese Process Group are undertaking the Process Plant design; RKF & Smelter. Resindo is supporting Chinese Process / Solway for construction installation estimates, in-country logistics for construction & operations including coal for reductants & power plant. Resindo is also undertaking the Design for Balance of Plant & Infrastructure including; Coal fired Power Plant, MFO Power Plant (Option), Port/Jetty for bulk materials & reagents, bulk fuel farm & systems, roads, workshops, water supplies, camp, etc. Work includes integrated Capital & Operating estimate development. |
|
|
Finish
Jan 2012 - Dec 2013 |
3063 | Bahomoahi Ni Direct Shipment of Ore (DSO) | - | Central Sulawesi, Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Basic design and construction management of local earthworks and civil contractors for 40km of haul road, port & stockpile area for the drying and export of nickel laterite ore. |
|
|
Finish
Jan 2013 - Dec 2013 |
3062 | Sorowalio Ni Direct Shipment of Ore (DSO) | - | Central Sulawesi, Indonesia | PT. Solway Management Indonesia (Russia) |
|
|
Basic design and construction management of local earthworks and civil contractors port & stockpile area for the drying and export of nickel laterite ore. |
|
|
Finish
Jan 2012 - Dec 2013 |
3029 | Ni Process Plant: Offsite Service & Maintenance Study | - | Halmahera, Indonesia | Weda Bay Nickel, Eramet |
|
|
Review options and solutions for process plant equipment, crusher systems, other; maintenance offsite across Indonesia utilising synergies with existing Industries &/or developing remote facilities. Desktop review for local area capabilities, Capital & Operating Cost estimates at detailed level. |
|
|
Finish
Jan 2011 - Dec 2012 |
3024 | Morowali Nickel – Direct Ore Shipment Implementation Phase | - | Morowali Nickel – Direct Ore Shipment Implementation Phase Sulawesi, Indonesia | Bumanik/ JResources Group (Indonesia) (PSAB : IDX) |
|
|
Detail Engineering and Construction Management for the development of Direct Ore Shipment Infrastructure: Mine site infrastructure, haul roads, river port, managing specialist consultants for bathymetry & hydrology, geotechnical investigation |
|
|
Finish
Jan 2011 - Dec 2012 |
3024 | Morowali Nickel HPAL Process Plant & Support Infrastructure Study (PFS & GFS) | - | Sulawesi, Indonesia | Ausenco Vector (Aus) / Bumanik (Indonesia) |
|
|
Scoping Study for: Process Plant Infrastructure, Off site infrastructure including haul roads, Port infrastructure, camps, bulk fuel facilities, etc. Study includes Capex and Opex development for all areas. |
|